Quote:
Originally Posted by Aegis View Post
But the same argument could have been made when 7th ave was designated as an ROW. Burying the line under 8th, or building it above ground on 6th, provides the same utility to the end-user, but the above-ground option the cost is reduced. The extra cost of burying (and maintaining) and underground line would be better invested in more LRT expansion elsewhere.. that's all I'm saying.
That's if the expansion would actually be achievable considering 7th avenue is at capacity. What's the point of an expansion if we can't run the trains in the downtown? The 8th Avenue subway is not some kind of "oh wouldn't it be nice if people could wait inside for the train" or "oh I hate the noise of the train, let's move it underground" kind of thing. The 8th avenue subway is necessary because without it, we cannot add any more expansion elsewhere. Where will the extra trains go?
     
     
  #242  
Old Posted Mar 22, 2010, 1:10 AM
shogged's Avatar
shogged shogged is offline
someone
 
Join Date: Oct 2007
Location: Calgary
Posts: 453
Quote:
Originally Posted by Aegis View Post
But the same argument could have been made when 7th ave was designated as an ROW. Burying the line under 8th, or building it above ground on 6th, provides the same utility to the end-user, but the above-ground option the cost is reduced. The extra cost of burying (and maintaining) and underground line would be better invested in more LRT expansion elsewhere.. that's all I'm saying.
technically speaking an underground line would have more capacity than a line like 7th ave. 7th ave trains have to share the road with traffic, and while cars don't run on 7th ave itself, they do still have to cross it.

subway line through downtown doesn't have to wait for traffic lights, and could have a higher rate of speed because there aren't the same kind of hazards like 7th ave (peds, running red lights etc)

so not the same utility to the user! and therefore its going to be needed eventually because 7th ave is going to reach a capacity to the point where the system no longer operates at its peak efficiency, therefore losing utility. The cost of burying a line eventually evens out imo.
     
     
  #243  
Old Posted Mar 22, 2010, 4:11 AM
frinkprof's Avatar
frinkprof frinkprof is offline
Registered User
 
Join Date: Sep 2006
Location: The Gary
Posts: 4,865
Nevermind.

Last edited by frinkprof; May 22, 2010 at 1:46 PM.
     
     
  #244  
Old Posted Mar 22, 2010, 7:57 AM
DizzyEdge's Avatar
DizzyEdge DizzyEdge is offline
My Spoon Is Too Big
 
Join Date: Oct 2006
Location: Calgary
Posts: 9,162
Does anyone have the knowledge to come up with even a ball park figure of the cost of say 6th ave surface vs 8th ave tunnel? Just curious what the savings vs annoyance of 6th ave might be.
__________________
Concerned about protecting Calgary's built heritage?
www.CalgaryHeritage.org
News - Heritage Watch - Forums
     
     
  #245  
Old Posted Mar 22, 2010, 6:40 PM
Surrealplaces's Avatar
Surrealplaces Surrealplaces is offline
Editor
 
Join Date: Feb 2006
Location: Cowtropolis
Posts: 20,240
A couple of shot of LRT Platforms



     
     
  #246  
Old Posted Mar 22, 2010, 6:41 PM
MalcolmTucker MalcolmTucker is offline
Registered User
 
Join Date: May 2007
Posts: 11,595
Running both existing lines above ground but on separate streets requires a fair bit of infrastructure to be built, namely the Bow Trail connector to free up 6th St.

You would run the lines connected like this to prevent any train vs train crossings: NW-NE and W - S with the W-S running on 7th and the NW-NE running on 6th.

I would bet all the road improvements you need to only double capacity would be in the range of $200-$250 million, plus line construction/ reconstruction in the $120 million dollar range (tracks and stations). This is assuming that the 6th Ave road bridge over the Encana parkade being strong enough for LRT.

6th has lots of parkade access off of it aswell that would have to be relocated.

Considering that without land and relocation requirements the project would be in the range of the 8th ave subway, with only doubling capacity the subway seems the better choice. (and it helps protect the river front from the Bow Trail connector.)

So I guess the answer to your question is: how do you scope the project? If you don't care about replacing road capacity it is much cheaper, if you do it is only a tad cheaper.

Eventually you would need to build the subway anyways and in the mean time you need to buy more LRVs, possibly two since the setup unbalanced the system by connecting less busy branches with high demand branches.
     
     
  #247  
Old Posted Mar 22, 2010, 6:54 PM
Aegis's Avatar
Aegis Aegis is offline
Analyst, Commercial Mtgs
 
Join Date: Sep 2006
Location: Bankview
Posts: 1,457
Quote:
Originally Posted by frinkprof View Post
Building white elephants isn't the only alternative to playing catch up. As mentioned earlier, WestLRT was on the board in the 1990s in basically the same alignment that is being built today. So were many of the extensions to existing lines that didn't end up being done until the 2000s (Dalhousie, Crowfoot, Fish Creek, Somerset). None of these would have turned out to be white elephants had they been built as originally planned in the '90s
Yes, but, we didn't necessarily know that in 1991. Plus, there was NO MONEY BACK THEN.

My only point was that cities have constraints on them that prevent "the right projects" from a 2010 perspective from moving ahead 20 years before.
     
     
  #248  
Old Posted Mar 22, 2010, 7:00 PM
Surrealplaces's Avatar
Surrealplaces Surrealplaces is offline
Editor
 
Join Date: Feb 2006
Location: Cowtropolis
Posts: 20,240
Any idea when the subway study is going to be completed?

Quote:
Originally Posted by frinkprof View Post
Seems we already went over this a few months ago. No need to rehash those points again. We'll just have to wait for the subway study to finish.
     
     
  #249  
Old Posted Mar 22, 2010, 10:19 PM
frinkprof's Avatar
frinkprof frinkprof is offline
Registered User
 
Join Date: Sep 2006
Location: The Gary
Posts: 4,865
Nevermind.

Last edited by frinkprof; May 22, 2010 at 1:47 PM.
     
     
  #250  
Old Posted Mar 22, 2010, 10:26 PM
frinkprof's Avatar
frinkprof frinkprof is offline
Registered User
 
Join Date: Sep 2006
Location: The Gary
Posts: 4,865
Nevermind.

Last edited by frinkprof; May 22, 2010 at 1:47 PM.
     
     
  #251  
Old Posted Mar 23, 2010, 12:20 AM
Aegis's Avatar
Aegis Aegis is offline
Analyst, Commercial Mtgs
 
Join Date: Sep 2006
Location: Bankview
Posts: 1,457
Quote:
Originally Posted by frinkprof View Post
Fair enough. I am aware there was no money from any level of government.

Yes, we do have the benefit of hindsight, but I think there's something to be said for the fact that every project that was on the board in the 1990s (and would have been built had there been money) was exactly everything that is being built today. There's no "man, glad we didn't build that," going on here, which was basically what you're saying Montreal would have liked to have been saying about Mirabel when you gave that example. At least that's how I interpreted your post. About the '90s, hindsight has proven that the planning of the era was pretty sound, whereas financing those plans was not. You say that we have the benefit of hindsight now, but the hindsight now matches the foresight of 20 years ago.

The only thing that comes to mind that I'm glad never got built was a notion that never really got fully planned-out in the late '90s and early 2000s. That is the spur line off the South LRT that would have gone east down 22X and either delayed or replaced the SELRT.
Good points. We have been fortunate that our infrastructure planning, while extremely slow, has been fairly well thought-out. We don't have the white elephants that some other cities have.
     
     
  #252  
Old Posted Mar 23, 2010, 12:36 AM
srperrycgy's Avatar
srperrycgy srperrycgy is offline
I'm the bear on the right
 
Join Date: Jun 2004
Location: Calgary (Killarney)
Posts: 1,670
Quote:
Originally Posted by Aegis View Post
Good points. We have been fortunate that our infrastructure planning, while extremely slow, has been fairly well thought-out. We don't have the white elephants that some other cities have.
I don't think the infrastructure planning process itself was slow, but the building process was.
__________________
Stevinder.
* * * * * *
     
     
  #253  
Old Posted Mar 23, 2010, 4:20 AM
frinkprof's Avatar
frinkprof frinkprof is offline
Registered User
 
Join Date: Sep 2006
Location: The Gary
Posts: 4,865
Nevermind.

Last edited by frinkprof; May 22, 2010 at 1:47 PM.
     
     
  #254  
Old Posted Mar 23, 2010, 6:48 AM
mersar's Avatar
mersar mersar is offline
Registered User
 
Join Date: May 2006
Location: Calgary, AB
Posts: 10,083
Was mentioned on cptdb that former LRT cars 2019 and 2027 have been cut in half and the undamaged side of each bolted together, and were out this afternoon doing testing. With a new number of "2090" on the body.
__________________

Live or work in the Beltline? Check out the Official Beltline web site here
     
     
  #255  
Old Posted Mar 24, 2010, 3:35 AM
srperrycgy's Avatar
srperrycgy srperrycgy is offline
I'm the bear on the right
 
Join Date: Jun 2004
Location: Calgary (Killarney)
Posts: 1,670
Quote:
Originally Posted by mersar View Post
Was mentioned on cptdb that former LRT cars 2019 and 2027 have been cut in half and the undamaged side of each bolted together, and were out this afternoon doing testing. With a new number of "2090" on the body.
2090 was out this morning as well. I was waiting at 3rd St W, and there it was. I grabbed a pic w/ my phone, but didn't turn out.
__________________
Stevinder.
* * * * * *
     
     
  #256  
Old Posted Mar 24, 2010, 3:53 AM
Policy Wonk's Avatar
Policy Wonk Policy Wonk is offline
Inflatable Hippo
 
Join Date: Mar 2006
Location: Suburban Las Vegas
Posts: 4,015
Quote:
Originally Posted by frinkprof View Post
Is Epic Beard Man available?
__________________
Public Administration 101: Keep your mouth shut until obligated otherwise and don't get in public debates with housewives.
     
     
  #257  
Old Posted Mar 24, 2010, 5:54 AM
frinkprof's Avatar
frinkprof frinkprof is offline
Registered User
 
Join Date: Sep 2006
Location: The Gary
Posts: 4,865
Nevermind.

Last edited by frinkprof; May 22, 2010 at 1:47 PM.
     
     
  #258  
Old Posted Mar 24, 2010, 4:53 PM
DizzyEdge's Avatar
DizzyEdge DizzyEdge is offline
My Spoon Is Too Big
 
Join Date: Oct 2006
Location: Calgary
Posts: 9,162
Quote:
Originally Posted by Policy Wonk View Post
Is Epic Beard Man available?
He had to take an Amber Lamps.
__________________
Concerned about protecting Calgary's built heritage?
www.CalgaryHeritage.org
News - Heritage Watch - Forums
     
     
  #259  
Old Posted Mar 25, 2010, 3:36 PM
Surrealplaces's Avatar
Surrealplaces Surrealplaces is offline
Editor
 
Join Date: Feb 2006
Location: Cowtropolis
Posts: 20,240
Sorry if this has been asked before, but does anyone know the ridership stats of Calgary's LRT system? Wikipedia, says it's 266,000 daily, but looking around the web i see varying numbers. I can't seem to find recent numbers, even on CT's website.
     
     
  #260  
Old Posted Mar 25, 2010, 3:38 PM
Surrealplaces's Avatar
Surrealplaces Surrealplaces is offline
Editor
 
Join Date: Feb 2006
Location: Cowtropolis
Posts: 20,240
Quote:
Originally Posted by frinkprof View Post
This is the response I got via e-mail in late December from a transit representative after I inquired about it:
Thanks Frink!

I do see the advantages of having the South/NW line buried under eighth, especially for moving trains through the core quicker and increasing capacity. One thing I've noticed recently is that the 7th ave is really quite busy with people and pedestrian traffic due to the LRT. There's alot of potential to leverage that traffic and build a nice retail corridor. It's already getting better with the new station at TD square having retail access right off the platform, and the new proposed Century Park tower having retail fronting the LRT platform.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Calgary > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 2:17 PM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.