Quote:
Originally Posted by swimmer_spe
Part of that might be the challenges of the Phase 1. Things that come to my mine about Ottawa's new LRT is:
the problems running in snow,
The sinkhole at Rideau Centre,
The derailments over lack of maintenance,
Etc.
At no time do I think of how transformative it is and will be, unless I look at what they are doing and where it goes.
|
Part of the reason it’s easy to not think about that is that it won’t really be transforming much. Outside of the downtown and then the bit just east of Lincoln Fields, it’s most just one rapid transit system replacing an already existing rapid transit system. And one that takes a cheap route avoiding the actually populated parts of the city whenever possible.
Which was, honestly, acceptable for BRT since your bus would go along the transitway then pop out to serve your neighbourhood. But is annoying with LRT where you often have two transfers to get anywhere if you aren’t going downtown.
The city could have good BRT and a good quality core light metro, but, instead, they decided to ruin the BRT with an awkward tram pretending to be a metro running through farmland just so they could have
more rail, but then less actual rapid transit.