Quote:
Originally Posted by Horus
Looking at it from this perspective, it makes the St-Raymond segment seem less effective than it might be to route directly north from POW bridge (via Saint-Joseph?) and working up to Gamelin to rejoin the proposed route at Plateau. If those are distinct lines, having the interlined segment between Taché and Saint-Joseph stations is of little benefit.
I get it from a logistical standpoint, that Saint-Raymond is the path of least resistance as it has a wide ROW and median to use, but wouldn't using the Gamelin ROW across Gatineau Park, then curving south (perhaps at Moussette?) and then finding a route to the Saint-Joseph/Taché approach to the POW bridge provide a wider coverage range? If they could convince the NCC to give them access to the portion of Prom Lac-des-Fées between des Allumettières and Taché, they could connect to Moussette. This would service the Hospital area and provide at least somewhat close range (10-15min walk) to the Vincent-Massey complex. Then, when the Rapibus is converted to LRT, the Wrightville sector of Hull would have LRT service on both sides.
|
The thing is, the focus is on residents west of Gatineau Park (they claim that 42.6% of current residences there will be within a 700m walk from a station). If you look at the "Map showing the distance from residences" on pg. 19, you will see the two stations on Saint-Raymond contribute to that coverage (see inside the orange circle in my clip below). A more northern route would be more beneficial to Hull residents, not "Aylmer" ones.
Having said that, I do agree that running south and interlining between boulevard Saint-Raymond and Prince of Wales Bridge, probably isn't the best option overall. I don't think Gamelin is the best route though as it is very narrow and would require either a lot of land expropriation to widen it or grade separation. Both of these options would be very expensive.
A better option IMHO would be to run along Allumettières from Saint-Raymond to Laurier (shown in blue on my clip below), where it could be switched onto the other line to either loop back through Hull or continue across the Alexandra Bridge to Rideau.
As for the POW bridge, I just don't see it being the right choice. We are only considering it because it is there. Back when it was built in 1880, LeBreton Flats was the industrial centre of Ottawa and the Broad St. Station (located just south of where the War Musium now sits) soon after became Ottawa's first Union Station (Ottawa's central railway station that is where we now call downtown wasn't built until 1912). Now, it doesn't take anyone anywhere useful. That will change a bit with the development of LeBreton Flats, but most people's destination will still be downtown.
Instead I think we should revert the Chaudière Bridge back to an LRT bridge (it was previously used for Street Cars) and then have it run to Bay and Spark Street (or possibly a bit further). This (when combined with a Rideau St. Station) would get most people within a 700m walk of their destination. Those who aren't, could then transfer to a train (or bus) that has already alighted a significant portion of its passengers.