Quote:
Originally Posted by bomberjet
But the Province really has an issue with over doing things. St Mary's estimated cost is $135 million with all that highway work and new roads being built.
|
^^^This. Overbuilding. I'm all for doing good work. But overdoing it and squandering money means we get priced out of ANY work. Leaving us stuck with the current nothing: which is BRUTALLY underbuilt. Just build reasonable.
St Mary's is an absolute nightmare. Does WSP think land grows on trees? There's tentacles everywhere. A simple clover with collectors would have worked fine. Even a compact diamond. They pillaged almost 160 acres of land for that monstrosity for a relatively low flow road. Do they even think?
For perspective, Perimeter and Portage has an 80 acre clover which is still chugging along.
Quote:
Originally Posted by bomberjet
Either way, in the ball park of the $10-15 million ish for a bridge out at PTH 5. Ramps are pretty cheap. $20-25 million to get it done. Construction cost.
|
Agree, we're getting consensus here in the $10-30m range. Centered in the $15m-25m range. Build inefficiently, higher end of that range. Streamline design, plug-n-play prints, dedicated team and suppliers = lower end of this spectrum in price and time.
People need to remember, we're talking a 2 lane bridge in the boonies. Not an 8-lane expressway in Los Angeles.
Quote:
Originally Posted by Biff
From a major contractor who actively does projects like this - $15-25m for bridge and ramp work - design and land acquisition extra.
|
Bingo. Rural land acquisition is peanuts. But add $70 million for WSP designers no doubt. /Sarc