HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Québec


Reply

 
Thread Tools Display Modes
     
     
  #201  
Old Posted Mar 30, 2021, 5:03 PM
Dengler Avenue's Avatar
Dengler Avenue Dengler Avenue is offline
Road Engineer Wannabe
 
Join Date: Sep 2017
Location: Côté Ouest de la Rivière des Outaouais
Posts: 8,276
Chantiers de la Route 185

https://www.infodimanche.com/actuali...taires-en-2021
Le M.T.Q. va lancer 3 appels d’offre pour les tronçons actuellement en construction puis 2 autres pour 2 nouveaux tronçons qui se trouvent tous à Saint-Honoré.
__________________
My Proposal of TCH Twinning in Northern Ontario
Disclaimer: Most of it is pure pie in the sky, so there's no need to be up in the arm about it.
Reply With Quote
     
     
  #202  
Old Posted Apr 9, 2021, 11:16 AM
Dengler Avenue's Avatar
Dengler Avenue Dengler Avenue is offline
Road Engineer Wannabe
 
Join Date: Sep 2017
Location: Côté Ouest de la Rivière des Outaouais
Posts: 8,276
__________________
My Proposal of TCH Twinning in Northern Ontario
Disclaimer: Most of it is pure pie in the sky, so there's no need to be up in the arm about it.
Reply With Quote
     
     
  #203  
Old Posted Apr 27, 2021, 1:36 AM
Dengler Avenue's Avatar
Dengler Avenue Dengler Avenue is offline
Road Engineer Wannabe
 
Join Date: Sep 2017
Location: Côté Ouest de la Rivière des Outaouais
Posts: 8,276
Pour la Route 175 en réserve faunique laurentienne, les plus profoundes coupes de roc (disons, plus de 20 m), où se trouvent-t-elles, et combien de mètres atteignent-t-elles?
(En passant, je me suis rendu jusqu'à l'Étape avec mon ami en été 2018.)
__________________
My Proposal of TCH Twinning in Northern Ontario
Disclaimer: Most of it is pure pie in the sky, so there's no need to be up in the arm about it.
Reply With Quote
     
     
  #204  
Old Posted May 9, 2021, 3:31 AM
EasternFreeway's Avatar
EasternFreeway EasternFreeway is offline
Registered User
 
Join Date: Sep 2019
Location: On the road
Posts: 198
Ma dernière vidéo à travers Rimouski sur la Route 132
https://www.youtube.com/watch?v=6izVubJjySc
__________________
Watch my videos on YouTube : https://www.youtube.com/channel/UCQR...vUlXOQ88E7cVDQ
Reply With Quote
     
     
  #205  
Old Posted May 13, 2021, 5:15 PM
Dengler Avenue's Avatar
Dengler Avenue Dengler Avenue is offline
Road Engineer Wannabe
 
Join Date: Sep 2017
Location: Côté Ouest de la Rivière des Outaouais
Posts: 8,276
Le M.T.Q. a-t-il donc finalisé le tracé de l’Autoroute 20 entre Rivière Trois-Pistoles et Rimouski, maintenant que ce dossier sera réintégré au P.Q.I.??
__________________
My Proposal of TCH Twinning in Northern Ontario
Disclaimer: Most of it is pure pie in the sky, so there's no need to be up in the arm about it.
Reply With Quote
     
     
  #206  
Old Posted May 13, 2021, 9:08 PM
Tone's Avatar
Tone Tone is offline
Riki beach
 
Join Date: Oct 2006
Location: Rimouski, Qc
Posts: 3,332
Quote:
Originally Posted by Dengler Avenue View Post
Le M.T.Q. a-t-il donc finalisé le tracé de l’Autoroute 20 entre Rivière Trois-Pistoles et Rimouski, maintenant que ce dossier sera réintégré au P.Q.I.??
À ma connaissance le tracé final n'est pas encore choisi, notamment en raison de deux groupes qui sont en opposition dans le coin de Saint-Fabien entre autres. Des agriculteurs ne veulent pas d'un tracé sur les terres agricoles versus des propriétaires de cabanes à sucre qui ne veulent pas d'un tracé dans les érables, à suivre..
Reply With Quote
     
     
  #207  
Old Posted May 15, 2021, 3:52 PM
Dengler Avenue's Avatar
Dengler Avenue Dengler Avenue is offline
Road Engineer Wannabe
 
Join Date: Sep 2017
Location: Côté Ouest de la Rivière des Outaouais
Posts: 8,276
Comma j’ai dit d’ailleurs, on devrait probablement doubler des voies de la 132 et construire des voies de déviation seulement absolument nécessaire, comme compromis. C’était ce qu’on a fait pour l’Autoroute 85 entre Saint-Louis-du-Ha!-Ha! et Dégelis de toute façon.
__________________
My Proposal of TCH Twinning in Northern Ontario
Disclaimer: Most of it is pure pie in the sky, so there's no need to be up in the arm about it.
Reply With Quote
     
     
  #208  
Old Posted May 16, 2021, 1:51 PM
Acajack's Avatar
Acajack Acajack is offline
Unapologetic Occidental
 
Join Date: Aug 2006
Location: Province 2, Canadian Empire
Posts: 70,081
Est-ce qu'on sait si ce nouveau segment de l'A-20 sera à 4 voies? Dans le coin de Rimouski c'est un super-2.
__________________
No, you're not on my ignore list. Because I don't have one.
Reply With Quote
     
     
  #209  
Old Posted May 16, 2021, 3:03 PM
Dengler Avenue's Avatar
Dengler Avenue Dengler Avenue is offline
Road Engineer Wannabe
 
Join Date: Sep 2017
Location: Côté Ouest de la Rivière des Outaouais
Posts: 8,276
Probablement juste à 2 voies sauf le pont de la Rivière des Trois-Pistoles qui sera à 4 voies, malheureusement. Bien, si on doit pour vrai twinner la 132 comme compromis, ça peut changer des choses. De mon avis, dans ce cas, ça ne fera plus du sens qu'on laisse les tronçons de super-2 tels quels.
__________________
My Proposal of TCH Twinning in Northern Ontario
Disclaimer: Most of it is pure pie in the sky, so there's no need to be up in the arm about it.
Reply With Quote
     
     
  #210  
Old Posted May 16, 2021, 3:43 PM
FrAnKs's Avatar
FrAnKs FrAnKs is offline
Registered User
 
Join Date: Jul 2005
Location: Ville de Québec / Quebec city
Posts: 5,788
Quote:
Originally Posted by Acajack View Post
Est-ce qu'on sait si ce nouveau segment de l'A-20 sera à 4 voies? Dans le coin de Rimouski c'est un super-2.
La vraie raison pour laquelle la réalisation de ce tronçon traine c'est que le débit journalier moyen annuel est encore plus bas qu'entre rivière-du-loup selon le site du ministère des transports. Par contre, plusieurs tronçons de l'A20 qui contournent Rimouski ont déjà dépassé ou sont tout près d'atteindre le chiffre magique de 10 000, qui, selon le MTQ, justifie une route à 4 voies séparées.
__________________
PROVINCE OF QUEBEC ==> 9 068 000
MONTREAL METRO ==> 4 600 000
QUEBEC CITY METRO ==> 900 000
Reply With Quote
     
     
  #211  
Old Posted May 20, 2021, 9:32 PM
Dengler Avenue's Avatar
Dengler Avenue Dengler Avenue is offline
Road Engineer Wannabe
 
Join Date: Sep 2017
Location: Côté Ouest de la Rivière des Outaouais
Posts: 8,276
On trouve des gros problèmes avec le pont de l'Autoroute 40 au-dessus du lac des deux montagnes, donc on suspend le péage sur l'Autoroute 30 pour l'instant.
__________________
My Proposal of TCH Twinning in Northern Ontario
Disclaimer: Most of it is pure pie in the sky, so there's no need to be up in the arm about it.
Reply With Quote
     
     
  #212  
Old Posted Jun 2, 2021, 1:08 PM
Dengler Avenue's Avatar
Dengler Avenue Dengler Avenue is offline
Road Engineer Wannabe
 
Join Date: Sep 2017
Location: Côté Ouest de la Rivière des Outaouais
Posts: 8,276
https://goo.gl/maps/qnj7cfU6NbRXVQc67
J’ai su qu’il n’aurait pas d’espace pour une autre chaussée sous le pont d’étagement de la Route Morault. Ça ne fait pas du sens comme nouvelle infrastructure.
__________________
My Proposal of TCH Twinning in Northern Ontario
Disclaimer: Most of it is pure pie in the sky, so there's no need to be up in the arm about it.
Reply With Quote
     
     
  #213  
Old Posted Jun 22, 2021, 12:09 PM
Dengler Avenue's Avatar
Dengler Avenue Dengler Avenue is offline
Road Engineer Wannabe
 
Join Date: Sep 2017
Location: Côté Ouest de la Rivière des Outaouais
Posts: 8,276
https://www.youtube.com/watch?v=xYv9XHIQj1E
On va voir des travaux majeurs sur le pont Pierre Laporte dès 27 juin, pour une durée de 20 jours au plus. En même temps, on attend des importantes entraves sur l'autoroute 20 à partir de St-Nicolas jusqu'au centre-ville de Lévis dans cette période.
__________________
My Proposal of TCH Twinning in Northern Ontario
Disclaimer: Most of it is pure pie in the sky, so there's no need to be up in the arm about it.
Reply With Quote
     
     
  #214  
Old Posted Jun 22, 2021, 8:57 PM
Dengler Avenue's Avatar
Dengler Avenue Dengler Avenue is offline
Road Engineer Wannabe
 
Join Date: Sep 2017
Location: Côté Ouest de la Rivière des Outaouais
Posts: 8,276
l'ouverture partielle de la nouvelle autoroute 85

https://ici.radio-canada.ca/nouvelle...-Dz7ZgbaPhODhM
Initialement partagé par @EaternFreeway
La chaussée nord de l'autoroute 85 est ouverte à la circulation en deux sens dans le secteur de Saint-Antonin sur une longueur de 11 km. La chaussée sud deviendra ouverte cet automne.
@Acajack @lio45 @le_calmar @FrAnKs @Tone j'ai de bonne nouvelle pour vous si vous voulez visiter le canada atlantique.
__________________
My Proposal of TCH Twinning in Northern Ontario
Disclaimer: Most of it is pure pie in the sky, so there's no need to be up in the arm about it.
Reply With Quote
     
     
  #215  
Old Posted Jun 22, 2021, 9:33 PM
Tone's Avatar
Tone Tone is offline
Riki beach
 
Join Date: Oct 2006
Location: Rimouski, Qc
Posts: 3,332
@Tone; J'évite ce secteur en passant par la 232 de Rimouski à Cabano si je veux emprunter la Transcanadienne vers les Maritimes mais oui c'est une très bonne nouvelle!
Reply With Quote
     
     
  #216  
Old Posted Jun 26, 2021, 2:01 PM
Dengler Avenue's Avatar
Dengler Avenue Dengler Avenue is offline
Road Engineer Wannabe
 
Join Date: Sep 2017
Location: Côté Ouest de la Rivière des Outaouais
Posts: 8,276
Quote:
Originally Posted by Tone View Post
@Tone; J'évite ce secteur en passant par la 232 de Rimouski à Cabano si je veux emprunter la Transcanadienne vers les Maritimes mais oui c'est une très bonne nouvelle!
De rien, @Tone.
En parlant de la 232, a-t-elle techniquement deux tronçons distincts?
Voice ce que je veux dire:
Elle chevauche l'autoroute 85 entre les sorties 37 et 40, supposément, mais cette première n'y est jamais signée.
Vue de l'autoroute au km 38,5 en direction nord: https://www.google.com/maps/@47.6736...7i13312!8i6656
On ne voit que le signe de la 85, mais pas celui de la 232.
Puis vue en direction sud au km 39:
https://www.google.com/maps/@47.6781...7i16384!8i8192
C'est la même chose.
Puis les deux routes de desserte dans ce secteur appartiennent probablement à la ville de Cabano, donc la 232 ne semble pas contiguë là.
__________________
My Proposal of TCH Twinning in Northern Ontario
Disclaimer: Most of it is pure pie in the sky, so there's no need to be up in the arm about it.
Reply With Quote
     
     
  #217  
Old Posted Jun 28, 2021, 3:53 PM
Tone's Avatar
Tone Tone is offline
Riki beach
 
Join Date: Oct 2006
Location: Rimouski, Qc
Posts: 3,332
^Intéressante remarque, j'ai toujours pensé que c'est un seul tronçon. Je regarde la page Wiki de la 232 et ça dit:
Quote:
La 232 part à l'ouest sur la route 289 à Rivière-Bleue, se dirige vers Témiscouata-sur-le-Lac (secteur Cabano), croise la route Transcanadienne et ensuite la 234 à Saint-Narcisse-De-Rimouski.
Donc ça serait un seul tronçon techniquement, on dirait bien qu'ils ont décidé de ne pas ajouter la mention 232 sur le petit segment chevauchant l'A85.
Reply With Quote
     
     
  #218  
Old Posted Jul 19, 2021, 3:13 PM
EasternFreeway's Avatar
EasternFreeway EasternFreeway is offline
Registered User
 
Join Date: Sep 2019
Location: On the road
Posts: 198
Congestion dans le secteur de Trois Pistoles sur l'A-20
2,6km en 25min
https://youtu.be/tbkXpWym22c
__________________
Watch my videos on YouTube : https://www.youtube.com/channel/UCQR...vUlXOQ88E7cVDQ
Reply With Quote
     
     
  #219  
Old Posted Aug 27, 2021, 1:31 PM
Dengler Avenue's Avatar
Dengler Avenue Dengler Avenue is offline
Road Engineer Wannabe
 
Join Date: Sep 2017
Location: Côté Ouest de la Rivière des Outaouais
Posts: 8,276
https://cimtchau.ca/nouvelles/autoro...s-lecheancier/
Les chantiers de l’autoroute 85 progressent bien malgré le problème avec l’acquisition immobilière à Saint-Louis-du-Ha!Ha!.
(Les gens touchés sont assez bouleversés.)
__________________
My Proposal of TCH Twinning in Northern Ontario
Disclaimer: Most of it is pure pie in the sky, so there's no need to be up in the arm about it.
Reply With Quote
     
     
  #220  
Old Posted Sep 9, 2021, 2:15 AM
Dengler Avenue's Avatar
Dengler Avenue Dengler Avenue is offline
Road Engineer Wannabe
 
Join Date: Sep 2017
Location: Côté Ouest de la Rivière des Outaouais
Posts: 8,276
https://www.transports.gouv.qc.ca/fr...-route-169.pdf
Je suis toujours curieux. Ces voies de déviation de la route 169, feront-t-elles partie du prolongement de l’Autoroute 70?
__________________
My Proposal of TCH Twinning in Northern Ontario
Disclaimer: Most of it is pure pie in the sky, so there's no need to be up in the arm about it.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Québec
Forum Jump



Forum Jump


All times are GMT. The time now is 5:07 PM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.