Concrete was recently placed for the first of 14 transfer girders over the underground Marta tunnel at the 1105 West Peachtree project. These bonded post-tensioned concrete girders, ranging from 7-10 feet in overall depth, span between drilled pier deep foundations on each side of the tunnel and provide support for the 20-story condominium tower above.
The 1.75 million square foot project swallows the entire city block bounded by Atlanta’s 12th and 13th streets and West Peachtree Street and Peachtree Walk. The site will eventually house a 30-story office building and a 16 story, 178 key hotel in addition to the condominium tower. -Uzun + Case linkedin page