Quote:
Originally Posted by Mininari
1) Massey Tunnel: H99 Project vision. timeline... 2020+?
2) 72nd/91 lights; you're BANG ON. What a ridiculous situation.
3) 91 HOV could just merge back in like the HOV did for the Port Mann prior to its 5-laning... gives the HOV priority access to the bridge.
4) The need out-to-Abbotsford 6-laning will become ever more deseperately needed... maybe we'll see it along with modernization of 232 / glover / 264th interchanges... $300M project?
|
I really only drive HIghway 1 east through Abbotsford, so that's where my issues are.
The MOT redid the Fraser Highway/Mt. Lehman interchange 5-6 years ago, their upgrading the Clearbrook and McCallum interchanges this year, while 232 Street causes more problems than Clearbrook or McCallum ever did to traffic flow from what I seen.
Why 232 Street was NOT included in Gateway is beyond me - I've recently emailed the MOT asking why and whether or not any short-term upgrades are planned. Heck, all they need to do is
ramp metering to temporarily relieve EB merging traffic in the PM peak. Once that interchange is redone properly, hopefully 264 Street is soon after (even though it functions reasonably well).
Highway 1 DOES work alright right now as 2+2 laning right now from Langley to Abbotsford. However, I see that changing drastically in the next few years.
Either provide proper rapid transit (by rail - rather large proponent of Rail for the Valley) or widen the Highway.
I think what would work best is an 8 lane wide section of roadway east to Abbotsford, 3 general lanes in each way, and 1 HOV/Rapid Bus on the left. 6 lanes to Chilliwack should be done within the next 10 years - however, it likely will be closer to 25-30 years knowing how things are - if ever.
Oh and here's something for fore-sight - the McCallum Road and Clearbook interchanges in Abbotsford were designed to accommodate 6 lanes total....Yikes....crazy how today it should already be 6 lanes, and a possible 8 would probably be warranted in less than 10 years.