Originally Posted by NewYorkSkyline117
I'm trying to but Adobe Flashplayer is giving me a problem...just curious, but how long should that take?
|
There is a lot of work going on at the same time in the east bathtub hub area, the structure should be to grade level end of this year, but as you will see from photo, concrete slab at elev 274 is marching west towards the #1 subway line as DCM installs the lower steel for the hub. Skansa'Koch will be installing a new tower crane this fall and start the Oculus steel erection while DCM continues to finish below grade steel towards the west portion.