Quote:
Originally Posted by zzptichka
We love rail. As long as it doesn't kill already established and successful rail in the process.
Moose has a good cheap option for their regional rail without disrupting O-Train LRT but for some reason they want to go after an expensive and unrealistic pie in the sky instead. Without any money for it to boot.

|
I don't think there would be sufficient demand to go east of the VIA station on the corridor suggested. However, if there was a Phase 2 eventually, I would build along the old CPR right of way and then switch over to South Orleans Transitway right of way. A combination of that and the 94 bus on Innes providing a connection at Blair might provide very good service for the south half of Orleans and lots of connectivity both to downtown and points west.
I could see stations at March Road, Highway 417 (Confederation Line connection), Moodie, Richmond Road, Queensway-Carleton Hospital, Greenbank, Woodroffe (future Confederation Line connection), Merivale, Prince of Wales, Riverside, Ellwood Junction/Mooney's Bay (Trillium Line Connection) , Billings Bridge, Hosptial Connector, VIA station (Confederation Line connection)
Phase 2 St. Laurent, Innes, Cyrville, Anderson (P&R), Navan Road, Mer Bleue, 10th Line, Innes, Trim