- Construction elevators being installed Sunday 5/21
- Last pour on P9 on Saturday 5/20 (still at 18 days between levels)
- Scaffolding for ramps to P10 ready for rebar
- Ironwork continues around SW corner for awnings.
- Concrete block walls each side of ramp entrance/loading dock on 3rd street complete