Toronto construction projects 100-199m. Sorry some are a little blurry.
Waterpark Place 3 (30 floors, 140m).
U Condo's (55 floors and 45 floors, 184m and 154m).
Parade and TCHC 510 Bremner Boulevard (44 floors and 41 floors, 127.4m and 124.5m).
Hospital for Sick Childern Research Tower (21 floors, 117.3m).
MaRS (23 floors, 112.7m).
The Charlie (36 floors, 123.3m).
Clear Spirits Condo (40 floors, 136m).
Market Wharf (32 floors, 109m).
Southcore Bremner Tower and Delta Hotel (47 floors and 30 floors, 159.8m and 135.5m).
Burano (50 floors, 163m).
Cinema Condo (43 floors, 142.8m).
Couture (42 floors, 141m).
300 Front (52 floors, 156m).
All pictures by me.