Quote:
Originally Posted by twoNeurons
I wonder if they could market the M-Line West to Cambie as "Cheaper" than extending the platforms on the Expo Line.
That doesn't guarantee we'll get all the way to UBC on the first pass but connecting these lines in a triangle would epic.
The Athlete's village would become the most connected place in Vancouver.
|
That's exactly my thinking...
I can't be the only one who is appalled at the $3.1 billion pricetag for Expo Line improvements. I know that pricetag includes a 7 km extension in Surrey (which we should expect to cost under $1 billion, based on $100m/km plus some train cars). But that still leaves more than $2 billion being poured into Expo in the next 10 years to increase its capacity, mainly on the section that the Canada Line could relieve.
I bet we could connect the lines at Broadway & Cambie for under $1 billion, even with buying additional train cars for both lines.
$3.1 billion to extend Expo and increase Expo capacity
vs.
$1 billion to extend Expo + $800 million to extend Millennium to Cambie + $200 million to buy extra trains
With the latter plan, we would still have more than $1 billion left over to spend on Expo capacity wherever else it's needed, but we'd have two lines into downtown accessible by the entire network, and a head start on the line to UBC.