Quote:
Originally Posted by libtard
Please enough with the excuses. What I’m getting from the responses is our road builders are incapable of making a flat surface when it involves any type of pipe below the surface. Forget actually raising the level of the road anymore than the bare minimum (value engineering). I’ve driven on interstates and state highways all over Louisiana in harsh bayou country and never experienced anything like the road surface of the SFPR. They also have an extensive viaduct which is another piece of infrastructure BC is slow to adopt.
|
I don't think it's a cost excuse. It's more likely a schedule constraint. Preload takes a long time, so they probably figured they would build and repair rather than wait several years for preload to finish.
If anything, this is more expensive but ultimately happens on schedule driven projects.