Don't understand the overpriced part, the cost fit really well for what we got.

Yes, that bump is an annoyance and should be removed, but as I said before, with these projects moving forward this bump and the 80th street intersection are all that will remain from the portion west of the Patullo from being an adequate highway / freeway. (the section from west of 80th street to Tsawassenn is actually nicely leveled).

The section between the Patullo east to 116th street is the dogs breakfast that needs a major upgrade. And the very eastern end of the road with the GEW connector intersection.
__________________
Bridging the Gap
Check out my Flickr: https://www.flickr.com/photos/30634635@N03/with/29495547810/ and Youtube channel https://www.youtube.com/channel/UCV0_0h9qKlhxXFxuAey_q6Q
     
     
  #182  
Old Posted Jun 30, 2018, 12:23 PM
libtard's Avatar
libtard libtard is offline
Dahvie Fan
 
Join Date: Aug 2012
Posts: 1,310
No, its an overpriced turd with terribly low design speed, improperly leveled surfaces, bad interchange designs, and a freaking bike lane on the shoulder... on a "highway". What a joke
     
     
  #183  
Old Posted Jun 30, 2018, 6:46 PM
CanSpice's Avatar
CanSpice CanSpice is offline
Registered User
 
Join Date: Dec 2014
Location: New Westminster, BC
Posts: 2,716
I remember reading somewhere (here maybe?) that the bump is caused by a water or sewer main running under the highway there, and the preloading that the province had done on either side to compact the highway didn't do a good enough job, so the highway is subsiding on either side of the conduit, making the bump larger over time.

That's all bog land around there and it's going to subside no matter what. It's going to have to be fixed at one point or another.

And that said, if you're catching air going over that bump you're going way too fast for the conditions. The speed limit is 80kph and you should probably do it there. If you do you won't catch air.
     
     
  #184  
Old Posted Jul 3, 2018, 4:23 AM
makr3trkr makr3trkr is offline
Registered User
 
Join Date: Jun 2012
Posts: 593
While this project is a net positive, the logic behind removing four existing intersections while spending years disrupting traffic and then adding a new light where there wasn't one before on Nordel escapes me.
     
     
  #185  
Old Posted Jul 3, 2018, 5:57 AM
flipper316 flipper316 is offline
Registered User
 
Join Date: Dec 2016
Posts: 887
Quote:
Originally Posted by makr3trkr View Post
While this project is a net positive, the logic behind removing four existing intersections while spending years disrupting traffic and then adding a new light where there wasn't one before on Nordel escapes me.
They're only removing 2 intersections. 17 and the 91 Connector/River Road intersection and the 91 Connector/Nordel Way intersection.
     
     
  #186  
Old Posted Jul 3, 2018, 4:03 PM
makr3trkr makr3trkr is offline
Registered User
 
Join Date: Jun 2012
Posts: 593
Quote:
Originally Posted by flipper316 View Post
They're only removing 2 intersections. 17 and the 91 Connector/River Road intersection and the 91 Connector/Nordel Way intersection.
They are also removing the new lights that were installed at the bottom of Nordel hill and I was also including the intersection at 72nd
     
     
  #187  
Old Posted Jul 13, 2018, 6:25 AM
flipper316 flipper316 is offline
Registered User
 
Join Date: Dec 2016
Posts: 887
World's slowest interchange project? Today I drove by to check it out. Was shocked there isn't oven pavement down in the surfaces yet. Still just gravel. It's not even a complicated big interchange.
     
     
  #188  
Old Posted Jul 14, 2018, 1:30 AM
libtard's Avatar
libtard libtard is offline
Dahvie Fan
 
Join Date: Aug 2012
Posts: 1,310
Quote:
Originally Posted by flipper316 View Post
World's slowest interchange project? Today I drove by to check it out. Was shocked there isn't oven pavement down in the surfaces yet. Still just gravel. It's not even a complicated big interchange.
This is standard build speed in the US. Takes longer to build but it’s done to higher standards. Not just the interchange but the whole area is prone to sinking. As long as it’s done right the first time, longer build times don’t bother me. BC has a serious problem with levelling the surfaces of their highways properly. The same old piss poor excuse is used “we had to construct the road in challenging terrain” but it all comes down to value engineering. When this project is done and the other corresponding interchanges in the area are complete there better not be a single bump or dip in the road. The earth filled approach ramps on either sides of the overpasses LEVEL THEM PROPERLY. Please for the love of god learn from your mistakes with the current SFPR
     
     
  #189  
Old Posted Jul 14, 2018, 3:48 AM
VancouverOfTheFuture's Avatar
VancouverOfTheFuture VancouverOfTheFuture is offline
Registered User
 
Join Date: Apr 2014
Posts: 3,481
this is a bog. you can do all the levelling you want going above and beyond, it can still sink.
     
     
  #190  
Old Posted Jul 14, 2018, 4:44 AM
libtard's Avatar
libtard libtard is offline
Dahvie Fan
 
Join Date: Aug 2012
Posts: 1,310
Quote:
Originally Posted by VancouverOfTheFuture View Post
this is a bog. you can do all the levelling you want going above and beyond, it can still sink.
Piss poor value engineering excuse. How do you explain the terrible sunken areas east of 116 Ave on the SFPR. Bumps so bad they have a sign warning approaching drivers. And that’s not bog.
     
     
  #191  
Old Posted Jul 14, 2018, 5:20 AM
MIPS's Avatar
MIPS MIPS is offline
SkyTrain Nut
 
Join Date: Mar 2013
Location: Kamloops
Posts: 2,081
No but that was all preloaded river sediment.
That particular spot if I am correct has a high pressure sewer line that could not be moved so they had to be careful with compacting as to not damage the pipe.
It'll settle until it compact but that won't take as long as it will for the bog.
     
     
  #192  
Old Posted Jul 14, 2018, 5:29 AM
libtard's Avatar
libtard libtard is offline
Dahvie Fan
 
Join Date: Aug 2012
Posts: 1,310
Please enough with the excuses. What I’m getting from the responses is our road builders are incapable of making a flat surface when it involves any type of pipe below the surface. Forget actually raising the level of the road anymore than the bare minimum (value engineering). I’ve driven on interstates and state highways all over Louisiana in harsh bayou country and never experienced anything like the road surface of the SFPR. They also have an extensive viaduct which is another piece of infrastructure BC is slow to adopt.
     
     
  #193  
Old Posted Jul 14, 2018, 5:29 PM
Alex Mackinnon's Avatar
Alex Mackinnon Alex Mackinnon is offline
Can I has a tunnel?
 
Join Date: May 2008
Location: East Van
Posts: 2,202
Quote:
Originally Posted by libtard View Post
Please enough with the excuses. What I’m getting from the responses is our road builders are incapable of making a flat surface when it involves any type of pipe below the surface. Forget actually raising the level of the road anymore than the bare minimum (value engineering). I’ve driven on interstates and state highways all over Louisiana in harsh bayou country and never experienced anything like the road surface of the SFPR. They also have an extensive viaduct which is another piece of infrastructure BC is slow to adopt.
I don't think it's a cost excuse. It's more likely a schedule constraint. Preload takes a long time, so they probably figured they would build and repair rather than wait several years for preload to finish.

If anything, this is more expensive but ultimately happens on schedule driven projects.
__________________
"It's ok, I'm an engineer!" -Famous last words
     
     
  #194  
Old Posted Jul 31, 2018, 8:18 PM
libtard's Avatar
libtard libtard is offline
Dahvie Fan
 
Join Date: Aug 2012
Posts: 1,310
Quote:
Originally Posted by Alex Mackinnon View Post
I don't think it's a cost excuse. It's more likely a schedule constraint. Preload takes a long time, so they probably figured they would build and repair rather than wait several years for preload to finish.

If anything, this is more expensive but ultimately happens on schedule driven projects.
The problem with this theory is that they built, and repaired but repairing did nothing. The section in question has a new patch of asphalt where they tried to repair where the pipe is creating a bump in the road but its more than just a simple repave. Both directions of approaches to the bump need extensive leveling work done. Again, value engineering at its finest because a better design would have taken into account the settling of soil and raised the road over the pipe accordingly. Now we're left with essentially a speed bump on a "highway". Absolutely pathetic
     
     
  #195  
Old Posted Aug 7, 2018, 6:41 AM
flipper316 flipper316 is offline
Registered User
 
Join Date: Dec 2016
Posts: 887
Correct me if i'm wrong. Wasn't the on ramp from Nordel to 91 south supposed to be extended to merge in with the new off ramp to the 72 nd interchange. Drove by there today and nothing from that side is happening. The interchange has lights installed so looks like they might be close to finishing.
     
     
  #196  
Old Posted Aug 7, 2018, 9:47 PM
makr3trkr makr3trkr is offline
Registered User
 
Join Date: Jun 2012
Posts: 593
Quote:
Originally Posted by flipper316 View Post
Correct me if i'm wrong. Wasn't the on ramp from Nordel to 91 south supposed to be extended to merge in with the new off ramp to the 72 nd interchange. Drove by there today and nothing from that side is happening. The interchange has lights installed so looks like they might be close to finishing.
Due to the extra lane and weight on the AFB, they are testing the cables to make sure everything is sound, and they also have yet to reconfigure the interchange on Annacis Island, so it will be another year before the counterflow is open. They probably are just going to finish it at that time.
     
     
  #197  
Old Posted Aug 12, 2018, 8:04 PM
vancouverer vancouverer is offline
Registered User
 
Join Date: Jun 2012
Posts: 10
The overpass is opened!

The overpass is opened!

[Photos removed due to forum rules violation - please repost with appropriate photo credit]

Last edited by deasine; Aug 15, 2018 at 5:29 AM.
     
     
  #198  
Old Posted Aug 12, 2018, 9:03 PM
VancouverOfTheFuture's Avatar
VancouverOfTheFuture VancouverOfTheFuture is offline
Registered User
 
Join Date: Apr 2014
Posts: 3,481
Quote:
Originally Posted by vancouverer View Post
The overpass is opened!

[Photos removed due to forum rules violation - please repost with appropriate photo credit]
wow those are some tiny photos.

does the overpass work well?

Last edited by deasine; Aug 15, 2018 at 5:29 AM.
     
     
  #199  
Old Posted Aug 12, 2018, 10:56 PM
libtard's Avatar
libtard libtard is offline
Dahvie Fan
 
Join Date: Aug 2012
Posts: 1,310
No lane markings
     
     
  #200  
Old Posted Aug 13, 2018, 2:42 AM
ilikeredheads ilikeredheads is offline
Registered User
 
Join Date: Sep 2016
Location: west coast
Posts: 651
what is this? pictures for ants??

only took 3 decades to finally have an overpass, but it's here!!
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 10:11 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.