HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > London > Projects & Construction Updates


Reply

 
Thread Tools Display Modes
     
     
  #181  
Old Posted Apr 14, 2022, 7:18 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,411
New structural steel is now up for more floors for phase 2 of retirement building.
Reply With Quote
     
     
  #182  
Old Posted Apr 19, 2022, 1:47 AM
CanadianTalk CanadianTalk is offline
Moderator
 
Join Date: Jun 2021
Location: London, Ontario
Posts: 855
Tomorrow, planning committee will consider removing the holding previsions to permit the construction of two more mixed use buildings at West 5.

https://pub-london.escribemeetings.c...cumentId=91487

There are not many details in the document (such as the # of stories, site plan or renderings), but the map shows that this site is at the northwest corner of Riverbend and Linkway, which is immediately south of the retirement home currently under construction.
Reply With Quote
     
     
  #183  
Old Posted Apr 19, 2022, 1:36 PM
MrSlippery519 MrSlippery519 is offline
Registered User
 
Join Date: Dec 2010
Posts: 1,108
Interesting to see what they are building as the document you have linked appears to be everything BUT the main ~10 story building. If you look at the old site plans there does appear to be a smaller 5 or 6 story building which steps down to 3 where the site meets the retirement buildings.

Seems odd they would just build those buildings, unless the main site is already approved?
Reply With Quote
     
     
  #184  
Old Posted Apr 19, 2022, 10:20 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,411
The West5 website has a map showing the proposed developments within the area. Also has a 3D rendering feature.



https://west5.ca/live/community-map
Reply With Quote
     
     
  #185  
Old Posted Apr 21, 2022, 8:34 PM
CanadianTalk CanadianTalk is offline
Moderator
 
Join Date: Jun 2021
Location: London, Ontario
Posts: 855
Quote:
Originally Posted by CanadianTalk View Post
Tomorrow, planning committee will consider removing the holding previsions to permit the construction of two more mixed use buildings at West 5.
Planning committee unanimously approved this. Goes to full council on May 3rd.

-

It also looks like there is another holding-provision removal request for West 5 at the next planning committee meeting (on Monday). This time, it is to permit the development of the park and the entertainment pavilion at 1300 Riverbend Road.

https://pub-london.escribemeetings.c...cumentId=91700

The park will be bounded by Oxford St to the south, Riverbend Rd to the west, and Linkway Blvd to the north, as well as future development to the east.

Here is a rendering from West 5's website of what this may look like. I believe this would be looking southwest towards the Oxford/Riverbend intersection. If you go to West 5's website (link in the above comment), you can see more renderings.

Reply With Quote
     
     
  #186  
Old Posted Apr 22, 2022, 12:36 AM
Djeffery Djeffery is online now
Registered User
 
Join Date: Oct 2017
Location: London
Posts: 4,943
That will be good to see at least start to get done. People are living there now at a pretty penny for rent, and this is one of the amenities that rent is supposed to include. I'm sure they don't want to wait for 10 more years or longer while the area is fully built out before recreational aspects start getting done.
Reply With Quote
     
     
  #187  
Old Posted Apr 25, 2022, 3:49 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,411
Now landing the 5th floor concrete slabs in phase 2 of the retirement building.
Reply With Quote
     
     
  #188  
Old Posted Apr 26, 2022, 2:27 PM
johnnyhamont's Avatar
johnnyhamont johnnyhamont is offline
Registered User
 
Join Date: Dec 2015
Posts: 1,115
London’s West 5 to become Ontario’s first net-zero mixed-use community
https://canada.constructconnect.com/...-use-community



Six years in the making, the first net-zero mixed-use community in Ontario is taking shape in London.

A 70-acre development called West 5, it sets energy precedents that can help open doors for other green-conscious developments.

“The entire community will consume about 10 megawatts of energy which will be produced in the community” through solar means, Neil Carter, director of commercial construction, Sifton Properties Limited, one of West 5’s developers, told an audience recently at a Canada Green Building Council webinar on the project.

That solar power will be generated from panels on the roofs of all of its buildings, including a parking garage, and from solar arrays incorporated into many of the building’s facades.

When built out in 10 to 15 years, the neighbourhood will have 2,000 residential units and up to 400,000 square feet of commercial/retail space, Carter said....
Reply With Quote
     
     
  #189  
Old Posted May 9, 2022, 1:17 PM
MrSlippery519 MrSlippery519 is offline
Registered User
 
Join Date: Dec 2010
Posts: 1,108
New fencing has went up surrounding most of the "legacy square" areas which also seems to incorporate the play area they have mapped on the website from the initial plans.

There is also new construction on the area directly across from the Helio apartments, which is still not clear what portion of that building(s) they are starting with. Looks like Sifton is planning an active Spring/Summer which is good for the project.
Reply With Quote
     
     
  #190  
Old Posted May 12, 2022, 1:56 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,411
They got some of the 6th floor slabs on the east side of phase 2 of the retirement building installed prior to the construction trades union strike. They have installed some of the windows already on the lower floors
Reply With Quote
     
     
  #191  
Old Posted May 19, 2022, 3:34 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,411
LFP article on 2 more mid-rise buildings for West5. One apparently will be a condo.


https://lfpress.com/business/local-b...housing-demand
Reply With Quote
     
     
  #192  
Old Posted May 20, 2022, 3:16 PM
MrSlippery519 MrSlippery519 is offline
Registered User
 
Join Date: Dec 2010
Posts: 1,108
Quote:
Originally Posted by jammer139 View Post
LFP article on 2 more mid-rise buildings for West5. One apparently will be a condo.

https://lfpress.com/business/local-b...housing-demand
Looks like the site map on the west5 website has been updated to show these two as well.

https://west5.ca/live/community-map marked as Spektra and Candela
Reply With Quote
     
     
  #193  
Old Posted May 22, 2022, 2:27 PM
76samian 76samian is offline
Registered User
 
Join Date: Jan 2014
Posts: 60
Quote:
Originally Posted by MrSlippery519 View Post
Looks like the site map on the west5 website has been updated to show these two as well.

https://west5.ca/live/community-map marked as Spektra and Candela
Whats going on with the southwest corner? I thought it was zoned for commercial.
Reply With Quote
     
     
  #194  
Old Posted May 22, 2022, 7:35 PM
Djeffery Djeffery is online now
Registered User
 
Join Date: Oct 2017
Location: London
Posts: 4,943
Quote:
Originally Posted by 76samian View Post
Whats going on with the southwest corner? I thought it was zoned for commercial.
Southwest corner of what intersection?
Reply With Quote
     
     
  #195  
Old Posted May 22, 2022, 11:47 PM
76samian 76samian is offline
Registered User
 
Join Date: Jan 2014
Posts: 60
Quote:
Originally Posted by Djeffery View Post
Southwest corner of what intersection?
north of oxford and east of west borne
Reply With Quote
     
     
  #196  
Old Posted May 23, 2022, 12:24 AM
Djeffery Djeffery is online now
Registered User
 
Join Date: Oct 2017
Location: London
Posts: 4,943
Going back over the thread, I don't see any indication of commercial uses for that plot. It's also possible Sifton doesn't own that land immediately NE of the intersection of Oxford and Westdel.
Reply With Quote
     
     
  #197  
Old Posted May 23, 2022, 4:10 PM
Spoofy Spoofy is offline
Registered User
 
Join Date: May 2016
Posts: 93
.

Last edited by Spoofy; Oct 10, 2023 at 9:58 PM.
Reply With Quote
     
     
  #198  
Old Posted Jun 6, 2022, 8:11 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,411
Structural steel beams now up for 7th floor and forming for stairwell/elevator concrete shaft under way.
Reply With Quote
     
     
  #199  
Old Posted Jun 26, 2022, 4:16 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,411
Roof slab now installed on this 7 story phase 2 retirement building.
Reply With Quote
     
     
  #200  
Old Posted Jul 20, 2022, 2:33 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,411
Roof top structural steel for mechanical penthouse now installed on phase 2 of the retirement building. Excavation for underground level for the new buildings south of the retirement buildings well under way now. They have removed the tower crane and its not clear if they plan to set it up again for one of the new buildings.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > London > Projects & Construction Updates
Forum Jump



Forum Jump


All times are GMT. The time now is 3:12 PM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.