East Coast Rail Line (Tumpat-Gemas)
Type: Hybrid Diesel Multiple Unit (DMU)
NEW
Speed: 120-140 km/hr (single track)
Operator: Keretapi Tanah Melayu (KTM) - KTM Intercity
This train still run to Johor Bahru until 2023-2024 before KTM ETS extension project from Gemas will complete.
![](https://i.postimg.cc/W1zFMbky/0025-A6-F7-FCAA-4-DD0-BFBB-C9-C42-CC3-D003.jpg)
@ Premala Com Construction Sdn Bhd
![](https://i.postimg.cc/D0xm6Rgj/07-FD599-C-EE32-4964-AD14-A8-EEC85-D8-C8-B.png)
@ Premala Com Construction Sdn Bhd