Quote:
Originally Posted by J.OT13
Is the site still missing railings? Might be a supply issue.
|
I went by the other day, the railings at the foot of the bridge are in place, but obviously mis-aligned.
There's paint cans and burlap on the bridge deck, perhaps deficiencies with the idiotic winter-applied waterproofing coatings that cost an arm and a leg for taxpayers to provide protection and heating for sensitive materials but didn't really matter because the bridge went all summer and Nepean Point is still not open so the membrane could have been done anytime in June or July??