Looks like this one has gotten another update.
It's now gone from 17 floors, 201 ft -> 18 floors, 211 ft -> 23 floors, 211 ft. But the units have gone from 218 -> 211 -> 148.
The updated specs for 2115 Kittredge St:
- 23 floors, 211 ft
- 148 units (133 studios, 66 2BR, 12 4BR)
- 24 of the units will be affordable
- 24,250 sq ft for the 325-seat theater
- Parking for 0 cars and 113 bicycles
The site:
https://maps.app.goo.gl/HFuf6GchN4Dk3xJo9
Quote:
Plans Increase For 2115 Kittredge Street, Downtown Berkeley
By: Andrew Nelson 5:30 am on September 13, 2024
New zoning permits have been filed for a taller iteration of the California Theater Housing tower at 2115 Kittredge Street in Downtown Berkeley, Alameda County. The updates use Assembly Bill 1287 to reach 23 floors above street level, retaining the planned live performance theater and adjusting the residential capacity. Rhode Island-based Gilbane Development is responsible for the project.
...
The 23-story building is now expecting to add 148 apartments, which translates to a five-floor increase and a 63-unit reduction. However, the increase in scale is still likely to translate to a significant increase of residential capacity by adding bigger apartment sizes that attract groups of prospective college students. Of the 148 dwellings, 24 will be designated as affordable housing, half for very low-income households and half for moderate-income households.
|
https://sfyimby.com/2024/09/plans-in...-berkeley.html
Quote:
Originally Posted by homebucket
An update! Also with updated renderings:
The updated specs for 2115 Kittredge St:
- 18 floors, 211 ft
- 211 units (133 studios, 66 2BR, 12 4BR)
- 22 of the units will be affordable
- 24,250 sq ft for the 325-seat theater
- Parking for 0 cars and 113 bicycles
|