From the YWG Master Plan. Page number 46.
https://www.ywg.ca/assets/pages/YWGMasterPlan0615.pdf
FUTURE DEMAND KEY MASTER PLAN 2033 DIRECTIONS
Passenger growth to nearly double to
6.0 million by 2033;
Peak hour growth varies by sector,
with largest growth in arrivals (over
70%) and departures/international
(52% increase); and
24 gates needed.
Expand the terminal building by:
– adding a ground-level four-gate facility to
the east of the terminal building; and
– building a facility expansion to the west to
meet gating demand;
Implement Quick Connect processes to
facilitate growing domestic-to-U.S.
connections;
Address constraints in the long term for
circulation/holdroom space;
Continue to allocate more airside
retail/concessions space;
Implement next generation kiosk-based
border clearance solutions with CBSA; and
Work with CBP to improve processing
capacity and hours of service