Quote:
Originally Posted by craigs
I was under the impression that CAHSR will electrify the Metrolink tracks between Hollywood Burbank Airport and Union Station. Is that incorrect?
|
CAHSR and Metrolink will share partial ROW (but not tracks) between Union Station to Burbank. CAHSR is laying down its own tracks in this section. Whereas in Bay Area, CAHSR paid for Caltrain electrification so they share tracks. This is the main difference why Caltrain is already undergoing electrification while Metrolink is still stuck with freight locomotive.
Also, the main reason why LA to SD portion was left out in the Phase 1 build out plan was due to lack of existing passenger-only ROW heading east/south from Union Station out of LA basin. Imagine if CAHSR only planned to build it to San Jose and not San Francisco...
Bay Area politicians foreseen this problem that CAHSR will only build to San Jose and declare mission accomplished. So they passed a law to force CAHSR and Caltrains to work together to bring thru-service to San Francisco. Most SoCal politicians don't even know Metrolink is not the same agency as Metro.
From the CAHSR website about the Bay Area section:
"The San Francisco to San José project section differs from others because state legislation defined the alignment. Per the requirements of Senate Bill (SB) 1029 and regional multi-agency agreements, high-speed rail service along the San Francisco to San José corridor will be a
blended service with Caltrain and high-speed rail service sharing tracks."
https://hsr.ca.gov/high-speed-rail-i...o-to-san-jose/
Here is what CAHSR says about Burbank to LA section:
"The approximately 14-mile project section proposes to
utilize the existing railroad right-of-way to the greatest extent possible, adjacent to the Los Angeles River, through the cities of Burbank, Glendale and Los Angeles with proposed stations near the Hollywood Burbank Airport and at LAUS."
https://hsr.ca.gov/high-speed-rail-i...o-los-angeles/
And of course Palmdale to Burbank is going to be completely separate ROW in a tunnel (this is a good thing... but it also means Metrolink electrification is on its own timetable)
https://hsr.ca.gov/high-speed-rail-i...le-to-burbank/