HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Diagrams & Database > Building Requests & Database Corrections > Completed Requests


Reply

 
Thread Tools Display Modes
     
     
  #1  
Old Posted Jul 13, 2024, 11:18 AM
Chuq Chuq is offline
Registered User
 
Join Date: Oct 2003
Location: Hobart, Tasmania, Australia
Posts: 50
BUILDING REQUEST - Macquarie Point Stadium | Hobart, Australia | [proposed]

----------------------------------------------------------------------
BUILDING REQUEST FORM
-----------------------------------

Country: Australia
State/Province: Tasmania
City: Hobart

Building Name: Macquarie Point Stadium
Native Name:
Other Names:
Street Address: Evans St
Postal Code: 7000

Architect(s): COX Architecture
Developer:

Official sources: https://macpoint.com/stadium
Unofficial sources: (ABC news source)
Misc: https://imgur.com/a/wkpVKS0 - collection of renders

Interesting Facts/Records (in own words): Will have the largest fixed timber/ETFE stadium roof in the world

Official Building Website URL: https://macpoint.com/stadium
Wikipedia.org URL: https://en.wikipedia.org/wiki/Macquarie_Point_Stadium
CTBUH.org URL :
Structurae.de URL:

Coordinates (with decimal fraction): -42.8797, 147.3367

Heights--
PLEASE PROVIDE SOURCES FOR HEIGHTS, OTHERWISE WE WILL ASSUME THEY ARE ESTIMATES AND HEIGHTS NOT BE SHOWN.
Reminder: (Use Meters)

The edges of the stadium are around 22 metres (25.5 metres RL*) compared to the Evans Street level which is around 3.5 metres RL.
The structure has a fixed-dome roof, which at the highest point is 51 metres (54 metres RL), with an internal field height of 3 metres RL,
which is similar to the current level of Evans Street.
(source)

- antenna:
- spire:
- roof: (top of dome) 51m
- top floor:
- other heights: (edge of structure) 22m

Current Building Status (Built, Proposed, Cancelled, Destroyed, etc...): proposed

Construction Dates--

"Shovels are anticipated to strike the Macquarie Point surface late next year, with 60 per cent of the build to be completed by September 2027, and the stadium open for business for the start of the 2029 AFL season." (source)

- started: 2025 (planned)
- finished: 2029 (planned)
- destroyed:

Above ground floors: N/A
Underground floors: N/A
Unit count: N/A

Building Use(s): sports
Building materials: concrete, timber, ETFE (roof)
Structure Type(s): stadium

Last edited by Chuq; Jul 13, 2024 at 11:19 AM. Reason: location in title
Reply With Quote
     
     
  #2  
Old Posted Yesterday, 12:39 PM
Artemco's Avatar
Artemco Artemco is offline
Ukrainian moderator
 
Join Date: Apr 2005
Posts: 4,621
Reply With Quote
     
     
End
 
 
Reply

Go Back   SkyscraperPage Forum > Diagrams & Database > Building Requests & Database Corrections > Completed Requests
Forum Jump



Forum Jump


All times are GMT. The time now is 2:29 AM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.