They have now finished pouring both the west and east end 6th floor stairwell/elevator shaft concrete walls. Have also installed structural steel posts and beams for the 3rd floor slab. Should see precast concrete floor slabs being installed next week for the 3rd floor.
Reply With Quote
     
     
  #42  
Old Posted Oct 6, 2023, 1:51 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,285
Forming for the elevator/stairwell shaft rooftop walls now underway.
Reply With Quote
     
     
  #43  
Old Posted Oct 18, 2023, 7:36 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,285
The mechanical penthouse elevator/stairwell shafts are now poured. They are forming a small concrete shaft for what I assume is a utility riser of some kind. They have also now started installing some of the 3rd floor precast concrete floor slabs on the west end.
Reply With Quote
     
     
  #44  
Old Posted Oct 20, 2023, 8:04 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,285
3rd floor pre-cast concrete floor slabs are now installed. Should see structural steel for the 3rd floor posts and 4th floor cross beams going in next week.
Reply With Quote
     
     
  #45  
Old Posted Nov 1, 2023, 6:13 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,285
Have started landing some of the 4th floor precast concrete floor slabs on the north side.
Reply With Quote
     
     
  #46  
Old Posted Nov 15, 2023, 5:00 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,285
Have started landing the 5th floor precast floor slabs.
Reply With Quote
     
     
  #47  
Old Posted Nov 28, 2023, 4:53 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,285
Have started landing the 6th floor precast concrete floor slabs today. Should see the structural steel for the 6th floor posts and roof cross beams going in next week. No reason the structure including the mechanical penthouse shouldn't be installed before the holiday break.
Reply With Quote
     
     
  #48  
Old Posted Dec 14, 2023, 4:43 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,285
Roof concrete slabs are now installed and they have started installing the structural steel for the mechanical penthouse. Making good progress with the steel wall joists both on the exterior walls and interior.
Reply With Quote
     
     
  #49  
Old Posted Dec 26, 2023, 10:51 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,285
The mechanical penthouse roof top concrete slabs are now installed. Making good progress installing the ground floor glass walls along the York St side. Also good progress installing the exterior wall steel studs and concrete board siding.
Reply With Quote
     
     
  #50  
Old Posted Jan 30, 2024, 10:06 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,285
Have got most of the exterior concrete board now installed and have started installing window units. The second floor glass wall is now installed along the Richmond side and have half installed along York side.
Reply With Quote
     
     
  #51  
Old Posted Feb 28, 2024, 4:11 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,285
Making progress installing the windows for the 3rd-5th floors now. Also good progress building the steel stud interior partition walls.
Reply With Quote
     
     
  #52  
Old Posted Mar 17, 2024, 4:43 PM
Djeffery Djeffery is online now
Registered User
 
Join Date: Oct 2017
Location: London
Posts: 4,883
City notice on social media indicates the crane will be coming down the first part of the week, meaning York St will be closed for a few days.
Reply With Quote
     
     
  #53  
Old Posted Mar 21, 2024, 4:29 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,285
They finally setup the mobile crane today and are removing the tower crane from this site. Yet another tower crane gone from the city skyline with Drewlo's crane on Talbot St likely next. From the heyday of a couple of years ago when we likely hit the peak of 20 tower cranes up in London we will soon be single digits.
Reply With Quote
     
     
  #54  
Old Posted Jun 29, 2024, 3:43 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,285
Exterior cladding now being installed on the south side York Street facing facade. Hard to tell if it is metal or some kind of concrete board.
Reply With Quote
     
     
  #55  
Old Posted Sep 18, 2024, 4:27 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,285
The masonry contractor has completed the west side elevator shaft brick install. They appear to be installing solar panels on the south facing wall of the elevator shaft. Also now starting to install the exterior brick along the York and Richmond podium facade. Still alot of exterior trim final touches left around the windows on the higher floors. They appear to have made progress on the interior finishing with signs of drywall now up.
Reply With Quote
     
     
End
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > London > Projects & Construction Updates
Forum Jump



Forum Jump


All times are GMT. The time now is 1:38 AM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.