Posted Sep 18, 2024, 4:27 PM
|
Registered User
|
|
Join Date: Jun 2016
Location: London
Posts: 6,285
|
|
The masonry contractor has completed the west side elevator shaft brick install. They appear to be installing solar panels on the south facing wall of the elevator shaft. Also now starting to install the exterior brick along the York and Richmond podium facade. Still alot of exterior trim final touches left around the windows on the higher floors. They appear to have made progress on the interior finishing with signs of drywall now up.
|