Old Posted Apr 30, 2024, 12:41 AM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 10,650
Seems like they're almost at the bottom since the temporary staircase I think is at a similar count to Fifteen Fifteen though the bottom ladder section was double the length of the current ladder (which is still raised up from the rest of the pit)
Reply With Quote
     
     
  #42  
Old Posted Apr 30, 2024, 6:11 PM
griswold griswold is offline
Registered User
 
Join Date: Apr 2023
Posts: 81
Shouldnt this thread be labeled U/C?
Reply With Quote
     
     
  #43  
Old Posted Apr 30, 2024, 10:47 PM
Changing City's Avatar
Changing City Changing City is offline
Registered User
 
Join Date: Nov 2016
Posts: 6,393
Quote:
Originally Posted by griswold View Post
Shouldnt this thread be labeled U/C?
The status changes (if the mods are awake) when the first steel goes in and concrete is poured, (often for the tower crane base). Digging the hole doesn't count. (There have been too many stalled holes that stayed that way for years).
__________________
Contemporary Vancouver development blog, https://changingcitybook.wordpress.com/ Then and now Vancouver blog https://changingvancouver.wordpress.com/
Reply With Quote
     
     
  #44  
Old Posted May 22, 2024, 10:41 AM
officedweller officedweller is online now
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 38,872
From Lawrence Black twitter May 21st:


https://twitter.com/LawrenceBlackTV
Reply With Quote
     
     
  #45  
Old Posted Jun 14, 2024, 2:05 AM
officedweller officedweller is online now
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 38,872
From Lawrence Black twitter June 7th:


https://twitter.com/LawrenceBlackTV
Reply With Quote
     
     
  #46  
Old Posted Jul 3, 2024, 4:19 AM
officedweller officedweller is online now
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 38,872
From Lawrence Black twitter July 1st:


https://twitter.com/LawrenceBlackTV
Reply With Quote
     
     
  #47  
Old Posted Jul 29, 2024, 12:03 AM
Zepfancouver's Avatar
Zepfancouver Zepfancouver is offline
Registered User
 
Join Date: Aug 2017
Location: Vancouver
Posts: 1,906
Friday morning - July 27, 2024

I think they've reached the 7th and final level. The building core footing still needs to be excavated.

Noticed (Dec 18, 2023) the excavator (someone) was in the Christmas spirit...'Ho Ho'

https://makeagif.com/i/qFK7zK





Installing dowels in this last level along the southside, maybe for tying into a column footing or building core footing ?












Video Link
Reply With Quote
     
     
  #48  
Old Posted Jul 29, 2024, 2:04 AM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 10,650
Quote:
Originally Posted by Zepfancouver View Post
Friday morning - July 27, 2024

I think they've reached the 7th and final level. The building core footing still needs to be excavated.
Foundation permits just got issued.

Quote:
Stage 2 (foundation to grade - A/M/E/S) issued July 24/ 2024.
https://plposweb.vancouver.ca/Public...ctId=178831721
Reply With Quote
     
     
  #49  
Old Posted Jul 29, 2024, 2:33 AM
Zepfancouver's Avatar
Zepfancouver Zepfancouver is offline
Registered User
 
Join Date: Aug 2017
Location: Vancouver
Posts: 1,906
Quote:
Originally Posted by jollyburger View Post
Foundation permits just got issued.
https://plposweb.vancouver.ca/Public...ctId=178831721
Cool! I just linked the issued permit in my video description, thanks!
Reply With Quote
     
     
  #50  
Old Posted Aug 22, 2024, 9:13 PM
Zepfancouver's Avatar
Zepfancouver Zepfancouver is offline
Registered User
 
Join Date: Aug 2017
Location: Vancouver
Posts: 1,906
From Aug 16. 2024 taken by George I.
Much thanks to George for sharing his tour of Alberni by Kengo Kuma's penthouse suite.


https://www.dropbox.com/scl/fo/vt59j...=f3th2jps&dl=0


https://www.dropbox.com/scl/fo/vt59j...=9vs5x4ml&dl=0
Reply With Quote
     
     
  #51  
Old Posted Aug 23, 2024, 5:35 PM
griswold griswold is offline
Registered User
 
Join Date: Apr 2023
Posts: 81
Nice view.

Aren't there plans for dual towers on that empty lot next to it? Whatever happened with that?
Reply With Quote
     
     
  #52  
Old Posted Aug 23, 2024, 6:00 PM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 10,650
Quote:
Originally Posted by griswold View Post
Nice view.

Aren't there plans for dual towers on that empty lot next to it? Whatever happened with that?
Probably on hold like everyone else while they see what happens with the market/financing etc.
Reply With Quote
     
     
  #53  
Old Posted Aug 23, 2024, 7:50 PM
whatnext whatnext is online now
Registered User
 
Join Date: Feb 2009
Location: Vancouver
Posts: 23,271
Quote:
Originally Posted by griswold View Post
Nice view.

Aren't there plans for dual towers on that empty lot next to it? Whatever happened with that?
Like the Henriquez project on the Rosellen Hotel site west of Denman developers are finally starting to realize those offshore buyers with bags of cash ain't coming back. Nothing to do with interest rates.
Reply With Quote
     
     
  #54  
Old Posted Sep 9, 2024, 6:40 PM
mutagen mutagen is offline
Registered User
 
Join Date: May 2024
Posts: 1
Nobody on site this morning? Everything ok?
Reply With Quote
     
     
  #55  
Old Posted Sep 9, 2024, 7:17 PM
GenWhy? GenWhy? is online now
Registered User
 
Join Date: Jun 2017
Posts: 3,944
Excavation complete but no Building Permit phase 2?
Reply With Quote
     
     
  #56  
Old Posted Sep 9, 2024, 7:40 PM
madog222 madog222 is online now
Moderator
 
Join Date: Jan 2014
Location: Vancouver
Posts: 3,040
Quote:
Originally Posted by GenWhy? View Post
Excavation complete but no Building Permit phase 2?
Stage 2 Building Permit, foundation up to grade, was issued at the end of July.
Reply With Quote
     
     
  #57  
Old Posted Sep 9, 2024, 9:53 PM
Zepfancouver's Avatar
Zepfancouver Zepfancouver is offline
Registered User
 
Join Date: Aug 2017
Location: Vancouver
Posts: 1,906
Quote:
Originally Posted by mutagen View Post
Nobody on site this morning? Everything ok?
I have time tomorrow afternoon, I'll check it out.
We are due for an update for Park and Fifteen Fifteen.
I've been keeping an eye on this traffic cam W Georgia St and W Pender St (at Cardero St) , looking to capture the removal of the excavator in the pit, might get lucky with the heavy lift happening tomorrow, if it hasn't happen yet, we will know better tomorrow.
Reply With Quote
     
     
  #58  
Old Posted Sep 10, 2024, 10:55 PM
Zepfancouver's Avatar
Zepfancouver Zepfancouver is offline
Registered User
 
Join Date: Aug 2017
Location: Vancouver
Posts: 1,906
Quote:
Originally Posted by mutagen View Post
Nobody on site this morning? Everything ok?
Good question. Not a soul on site. It's haunting being there.
Uh-oh! oxidization, these shovel have been sitting idle for a week or two.
The core footing still needs to be excavated.

My pics from this afternoon Sep 10, 2024









Video Link

Last edited by Zepfancouver; Sep 11, 2024 at 10:19 PM.
Reply With Quote
     
     
  #59  
Old Posted Sep 10, 2024, 11:04 PM
GenWhy? GenWhy? is online now
Registered User
 
Join Date: Jun 2017
Posts: 3,944
Excavation permit amendment maybe?
Reply With Quote
     
     
  #60  
Old Posted Sep 10, 2024, 11:36 PM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 10,650
There's an inspection report from September 9 (the list page says end of August) but it still says "Excavation and shoring ongoing." and nothing about stopping work.

https://plposweb.vancouver.ca/Public...ctId=178831721

I don't think it's related to the CAC contribution payment extension since it was already extended until the Stage 3 permit (above grade work) or December 31st 2024.

https://council.vancouver.ca/20240227/documents/r3.pdf

Last edited by jollyburger; Sep 10, 2024 at 11:47 PM.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Downtown & City of Vancouver
Forum Jump



Forum Jump


All times are GMT. The time now is 6:58 PM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.