Quote:
Originally Posted by TransitZilla
Yes, but that was also part of the City/NCC deal.
https://ottawa.ca/en/city-hall/city-...ation-east-end
Having a separate MUP along Innes between Blair and Blackburn Hamlet should be a significant cycling improvement. The current unprotected/floating bike lanes on a 80km/hr road are pretty scary.
|
I'm reading between the lines and envisioning that the deal may actually be something like this:
[2015]
Ottawa: We want your land to build a Transitway.
NCC: No.
[2020]
Ottawa: We need your land to build a Transitway.
NCC: No.
[2023]
Ottawa: Waaah! But we want to extend Brian Coburn Rd to bypass that dogleg on Renaud Rd!
NCC: Fine. We'll trade you the land you need to extend Brian Coburn Rd for the current Renaud Rd, and you pay to revert it to a natural state, as long as you agree that it will remain a 2-lane road.
Ottawa: But we also want to put Transit lanes on Brian Coburn.
NCC: Not gonna happen. Take this deal or stuff it.
Ottawa: But we need to make it seem like this is actually a benefit for Orleans residents!
NCC: OK, then we can write up a joint press release and mention your existing transit priority measures on Innes Rd and Navan Rd... you know, to make it seem like it was part of the plan all along.
Ottawa: Deal. Phew, thanks man. I owe you one.