Arrow DALLAS | JW Marriott | FT | 25 FLOORS

Quote:
2000 Ross Avenue is an HKS designed, vertical mixed-use development, which will over 30,000 SF of retail, 351 residential units, and a 227-room hotel. The 26-story project will encompass an entire Downtown Dallas city block with frontage on RossAvenue, Harwood Street, San Jacinto Street and Olive Street. Its close proximity to the highly acclaimed Dallas Arts District and over 13M square feet of office provides for a compelling mix of restaurants and dining options.

Retail is scheduled for delivery in Q3 2017 and the entire project is scheduled for completion in Q3 2018.














Credits to ChampionDallas at dallasmetropolis for finding it and Sic'EmBears for posting it here on SSP.

Last edited by Dylan Leblanc; Nov 2, 2015 at 1:38 AM.
Reply With Quote
     
     
  #2  
Old Posted Jul 7, 2016, 9:26 PM
Sic'EmBears's Avatar
Sic'EmBears Sic'EmBears is offline
Registered User
 
Join Date: Sep 2011
Location: Dallas
Posts: 2,221
2000 Ross Avenue / Trammell Crow Center renovation update:
* Renderings were originally found and posted by myself on another forum

City-block project on Ross Avenue on track to get underway soon in downtown Dallas
Candace Carlisle
July 7, 2016

Quote:
A city-block development project meant to transform downtown Dallas' Ross Avenue adjacent to Trammell Crow Center is on track to get underway by early 2017, with plans to unveil the design of an upscale boutique hotel, ground-floor retail and an apartment tower this fall.
Quote:
Stream Realty is the master developer of the project on behalf of the ownership group 2000 Ross Avenue LP out of New York, which is a fund advised by JP Morgan Chase.

By developing 32,000 square feet of new space for restaurants and retailers, March said there's an opportunity to transform the Ross Avenue corridor. Plans for the ground-up development includes a 200-key upscale boutique hotel and a 350-unit apartment tower with each tower sitting on a podium of 2,600-stall parking garage and the retail space.

The hotel developer and residential developer have yet to be named, with an official announcement slated for this fall. HOK is the architect designing the ground-up project on the 2.6-acre tract.

The new mixed-use development is in the design process and is being dual-tracked with the renovations at Trammell Crow Center, a 1.2-million-square-foot office tower. Upon completion, Trammell Crow Center will have 10,000 square feet of added retail space to the ground floor of the building.

"This will be a real comprehensive renovation of Trammell Crow Center, which has never been altered in a meaningful way since its original design in the 1980s," March told me. "We want to do something there and expect it to be a dramatic design intervention."

Construction on the dual-tracked projects — the tower renovation and ground-up development — is expected to begin in early 2017.

Dallas-based Retail Street Advisors' Aaron Stephenson and John Giesler have already begun marketing the retail space to potential tenants.
Full Article

Last edited by Sic'EmBears; Mar 3, 2017 at 8:25 PM.
Reply With Quote
     
     
  #3  
Old Posted Mar 3, 2017, 8:24 PM
Sic'EmBears's Avatar
Sic'EmBears Sic'EmBears is offline
Registered User
 
Join Date: Sep 2011
Location: Dallas
Posts: 2,221
Equipment and parking lot lights have been removed.
Reply With Quote
     
     
  #4  
Old Posted Mar 9, 2017, 10:55 PM
Urbannizer's Avatar
Urbannizer Urbannizer is offline
Moderator
 
Join Date: Jan 2009
Location: Austin, TX
Posts: 12,859
__________________
HAIF
Reply With Quote
     
     
  #5  
Old Posted Mar 24, 2017, 4:29 AM
JoninATX JoninATX is offline
Registered User
 
Join Date: Aug 2009
Location: The ATX
Posts: 3,343
Bulldozer on site.
Reply With Quote
     
     
  #6  
Old Posted Mar 24, 2017, 4:30 AM
Sic'EmBears's Avatar
Sic'EmBears Sic'EmBears is offline
Registered User
 
Join Date: Sep 2011
Location: Dallas
Posts: 2,221
Construction crews have begun removing the asphalt.
Reply With Quote
     
     
  #7  
Old Posted May 19, 2017, 7:25 PM
ealba ealba is offline
Registered User
 
Join Date: May 2016
Posts: 39
Photo credit: self
Reply With Quote
     
     
  #8  
Old Posted May 19, 2017, 11:21 PM
dollaztx dollaztx is offline
Registered User
 
Join Date: Jan 2008
Location: Midcities
Posts: 566
Exciting time for downtown.
Reply With Quote
     
     
  #9  
Old Posted Jul 20, 2017, 6:53 AM
Rovette Rovette is offline
Registered User
 
Join Date: Jul 2017
Posts: 1
Quote:
Originally Posted by dollaeztx View Post
I think the designs look really cool. I can't wait to see it when it's done.

Last edited by Rovette; Dec 2, 2018 at 8:44 AM.
Reply With Quote
     
     
  #10  
Old Posted Jul 20, 2017, 2:07 PM
Dale Dale is online now
Registered User
 
Join Date: Dec 2001
Location: Charlotte
Posts: 4,878
Has the Hall Arts tower gotten underway ?
Reply With Quote
     
     
  #11  
Old Posted Aug 6, 2017, 12:33 AM
Sic'EmBears's Avatar
Sic'EmBears Sic'EmBears is offline
Registered User
 
Join Date: Sep 2011
Location: Dallas
Posts: 2,221
Tower crane is erect.
Reply With Quote
     
     
  #12  
Old Posted Dec 12, 2017, 4:22 PM
Slankard Slankard is offline
Registered User
 
Join Date: Dec 2017
Posts: 2
Quote:
Originally Posted by Sic'EmBears View Post
Tower crane is erect.
Cool, any update pics?
Reply With Quote
     
     
  #13  
Old Posted Dec 13, 2017, 6:02 PM
ealba ealba is offline
Registered User
 
Join Date: May 2016
Posts: 39




Photo credit: self
Reply With Quote
     
     
  #14  
Old Posted Dec 13, 2017, 6:31 PM
JMKeynes JMKeynes is offline
BANNED
 
Join Date: Aug 2017
Location: SW3
Posts: 4,216
Nice!

When were those photos taken? I see that some of the trees still have green leaves.
Reply With Quote
     
     
  #15  
Old Posted Dec 13, 2017, 7:06 PM
TTU Arch TTU Arch is offline
Registered User
 
Join Date: Oct 2004
Location: Dallas, Texas
Posts: 440
Those are Live Oak trees, and they typically loose their leaves in late winter (Feb / early March).....
Reply With Quote
     
     
  #16  
Old Posted Dec 13, 2017, 7:11 PM
ealba ealba is offline
Registered User
 
Join Date: May 2016
Posts: 39
Quote:
Originally Posted by JMKeynes View Post
Nice!

When were those photos taken? I see that some of the trees still have green leaves.
This morning
Reply With Quote
     
     
  #17  
Old Posted Dec 13, 2017, 7:13 PM
JMKeynes JMKeynes is offline
BANNED
 
Join Date: Aug 2017
Location: SW3
Posts: 4,216
You've got to love the climate in the Big D! It's the antithesis of iceberg Chicago!
Reply With Quote
     
     
  #18  
Old Posted Dec 13, 2017, 11:49 PM
Roman_Patrick's Avatar
Roman_Patrick Roman_Patrick is offline
Registered User
 
Join Date: Feb 2016
Posts: 114
Does anyone know if both towers are being built at this time?
I thought I heard they were only building 1 right now but im hoping they will do both
Reply With Quote
     
     
  #19  
Old Posted Dec 15, 2017, 2:30 PM
ealba ealba is offline
Registered User
 
Join Date: May 2016
Posts: 39
Quote:
The mixed-use development, upon build-out, will include a 400-unit high-rise residential tower, a 200-key boutique hotel, a 2,000-space parking garage and 26,000 square feet of retail space that could accommodate upwards of eight restaurant sites. The parking garage and retail are part of the initial phase of the project.

The hotel — an undisclosed flag has already been selected — is expected to get underway in 2018 upon completion of the initial phase. The high-rise residential tower will get started following the hotel.
Source: https://www.bizjournals.com/dallas/n...magnet-to.html
Reply With Quote
     
     
  #20  
Old Posted Mar 30, 2018, 10:37 PM
xcoaster1 xcoaster1 is offline
Registered User
 
Join Date: Mar 2018
Posts: 1
From today (03/30/2018)


Last edited by xcoaster1; Apr 5, 2018 at 7:56 PM.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Global Projects & Construction > Proposals
Forum Jump


Thread Tools
Display Modes

Forum Jump


All times are GMT. The time now is 5:54 PM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.