Alright guys, updates from the Airport from today!
1) The NSLC between Arrivals and the centre atrium is gone
2) The parking garage is making good progress.
3) Parking is still a mess.
4) They've got new TV's up inside the terminal building showing animations of the finished product that will be Stanfield International when it is all done. The animation shows a very nicely glass clad parking structure, and what I saw in the flythrough animation which was really neat and haven't seen anywhere else yet in any of the renderings was over-road glass pedways connecting the terminal building to the parking garage from what looked to be a second floor?, and what got me- a completely redesigned terminal building!! It looks as though it will be getting a makeover sometime in the near future, and it looked as well that it will be a cross between the back of the building facing the runway and the parking structure. I cant wait.
Now for photos!!
Looking at the terminal building from the check-in end of the building from just outside the construction fence:
Looking right coming out of the terminals centre tunnel:
Looking left:
What is up of the parking structure so far:
From the same spot, at full field of view:
View from about the centre of the building, top road:
The really good part about this whole project, which is smart and will make the building go up a hell of a lot faster is the fact they are constructing the main structure with all pre-fabricated pieces, we had passed about 5 of them coming from Dartmouth: