  #121  
Old Posted Jul 2, 2020, 8:49 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,061
Major concrete pour today with pump truck and lots of cement trucks queuing up.
Reply With Quote
     
     
  #122  
Old Posted Jul 5, 2020, 3:12 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,061
They have poured the L2 level floor slab. Will be removing the corner steel bracing soon in order to form and pour the L2 walls and posts over the coming weeks. Should be forming the L1 level floor by end of July.
Reply With Quote
     
     
  #123  
Old Posted Jul 9, 2020, 7:20 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,061
Given the number of Ellis-Don trucks I suspect they have been sub contracted to build this tower. Good timing as the concrete forming is now done at 515 Richmond St. Those experienced crews can move a couple of blocks south and form and pour York's 31 storey building. Old Oak is going to use Concrete Forming as contractor for their Centro project.
Reply With Quote
     
     
  #124  
Old Posted Jul 12, 2020, 3:52 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,061
Alot of steel rebar work done on walls, posts and elevator shaft with some forming completed. Suspect there will be some concrete pours this upcoming week and the week after that. L2 level walls should be completed then with forming on the L1 floor starting.
Reply With Quote
     
     
  #125  
Old Posted Jul 16, 2020, 11:53 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,061
Some of the L2 level walls have been poured.
Reply With Quote
     
     
  #126  
Old Posted Jul 21, 2020, 7:59 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,061
More progress on L2 walls and posts concrete pours today with numerous cement trucks on site.
Reply With Quote
     
     
  #127  
Old Posted Jul 25, 2020, 12:50 AM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,061
Wrapping up the L2 walls and posts. Have started forming for the L1 floor slab.
Reply With Quote
     
     
  #128  
Old Posted Jul 29, 2020, 1:54 AM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,061
Lots of progress on the L1 floor forming. Should be starting the steel rebar this week. Expect the concrete pour by end of next week.
Reply With Quote
     
     
  #129  
Old Posted Aug 1, 2020, 12:06 AM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,061
Alot of L1 floor steel rebar is now installed and the ramp to the L2 level is started. Even have some of the L1 elevator/stairwell forms up.
Reply With Quote
     
     
  #130  
Old Posted Aug 2, 2020, 8:48 PM
johnnyhamont's Avatar
johnnyhamont johnnyhamont is offline
Registered User
 
Join Date: Dec 2015
Posts: 1,115
thanks for the updates eh jammer139

Just pulling the final render back up for easier reference:

Reply With Quote
     
     
  #131  
Old Posted Aug 10, 2020, 3:31 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,061
Alot of cement trucks on site today. May be pouring L1 floor slab or just the ramp from L1 to L2 level today.
Reply With Quote
     
     
  #132  
Old Posted Aug 10, 2020, 8:59 PM
mcalpinestudios's Avatar
mcalpinestudios mcalpinestudios is offline
Registered User
 
Join Date: Nov 2017
Posts: 22
I'm pretty excited for this one, this and One Richmond Row really stand out in terms of design and something different for Downtown London. Riverwalk & Azure were a bit too safe or "Londonish" / lacking character.
__________________
Curator of @519London
McAlpine Studios Inc.
Reply With Quote
     
     
  #133  
Old Posted Aug 10, 2020, 9:17 PM
MolsonExport's Avatar
MolsonExport MolsonExport is offline
The Vomit Bag.
 
Join Date: Oct 2003
Location: Otisburgh
Posts: 45,544
yes this is a departure from the usual londonish conservativism (Harristonianism?) in terms of highrises.
Reply With Quote
     
     
  #134  
Old Posted Aug 11, 2020, 1:12 AM
sparky212's Avatar
sparky212 sparky212 is offline
Registered User
 
Join Date: Jul 2008
Location: London Ont.
Posts: 503
First formes are up for L1 today
Reply With Quote
     
     
  #135  
Old Posted Aug 12, 2020, 2:53 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,061
Pouring the L1 floor slab today. Concrete pump truck rig and steady supply of concrete trucks delivering today. The ramp from L1 to L2 was poured Monday. The large steel corner braces will likely be removed in the coming days to make way for the steel rebar and forming of the L1 walls and posts. Should be pouring the ground floor slab by mid Sept at their pace.
Reply With Quote
     
     
  #136  
Old Posted Aug 12, 2020, 3:13 PM
MrSlippery519 MrSlippery519 is offline
Registered User
 
Join Date: Dec 2010
Posts: 1,105
Excited to see this one get above ground, seems like they are making good progress lately.
Reply With Quote
     
     
  #137  
Old Posted Aug 19, 2020, 7:34 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,061
Concrete pump truck on site today with concrete trucks. Finishing the L1 slab pour and some of the L1 elevator and stairwell walls pours. The steel corner braces have also been removed.
Reply With Quote
     
     
  #138  
Old Posted Aug 23, 2020, 1:58 PM
johnnyhamont's Avatar
johnnyhamont johnnyhamont is offline
Registered User
 
Join Date: Dec 2015
Posts: 1,115


Reply With Quote
     
     
  #139  
Old Posted Sep 5, 2020, 11:12 AM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,061
Have made alot of progress on L1 walls and posts. Still have south side and east side walls and posts to form and pour thou. Have started forming for ground floor slab with about 60% of forms installed. Next week should see the L1 walls and posts poured and the steel rebar installation for ground floor slab started.
Reply With Quote
     
     
  #140  
Old Posted Sep 5, 2020, 4:25 PM
MolsonExport's Avatar
MolsonExport MolsonExport is offline
The Vomit Bag.
 
Join Date: Oct 2003
Location: Otisburgh
Posts: 45,544
what a great location.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > London > Projects & Construction Updates
Forum Jump


Thread Tools
Display Modes

Forum Jump


All times are GMT. The time now is 11:19 AM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.