Quote:
Originally Posted by prokowave
What they should do is starting the construction before the Beacon is finished. Who would want to move into a new apartment with a pile driver going every morning next door?
|
Honestly it seems like that's how they have been scheduling it. Finish the next buildings piling before the previous one opens. Given these timeframes Id expect to see plans given to the city in the next month or two. Also, once they start the standard don't be surprised to see part of the long lot along Loyola become a staging ground for construction.
Try to do a big update today for you guys:
Renovations and demolition planned for this gas station at the corner of canal and broad Street.
Permits:
801 Frenchmen St·HDLC COA · Permit #14-12796-HDLC ·Ref Code: 635JHT
Download (4)
Print Summary
Add to Watch List
progress
Type:
HDLC COA
Applicant:
Albert Architecture
Status:
Permit Issued
Date Filed:
8/24/2015 11:18:25 AM
Closed:
No
Description
Structural repair including new foundation to support new columns. Repairs to the exterior envelope, floor and roof framing are also included. Tenant improvement drawings for a new restaurant will be provided in the future . No Use and Occupancy.
1835 Canal St·Design Review · Project #15-1665 ·Ref Code: BNNVSV
Print Summary
Add to Watch List
progress
Type:
Design Review
Applicant:
Urban Roots LLC
Status:
Draft Application
Date Filed:
10/14/2015 11:43:14 AM
Closed:
No
Description
Applicant seeks a design review for a Enhancement Corridor distirct - plant store/florist
2425 Dauphine St·New Construction ·Ref Code: 3HJ1A6
Print Summary
Add to Watch List
progress
Type:
New Construction
Applicant:
Michael Bosio
Status:
Application Submitted
Date Filed:
10/20/2015 3:19:41 PM
Closed:
No
Description
2 family residence in a 8 unit condo complex
2421 Dauphine St·New Construction ·Ref Code: 05QGNL
Print Summary
Add to Watch List
progress
Type:
New Construction
Applicant:
Michael Bosio
Status:
Application Submitted
Date Filed:
10/20/2015 3:04:03 PM
Closed:
No
Description
Two family building in 8 unit condo complex
2327 St Philip St·New Construction ·Ref Code: WTC5JV
Download (2)
Print Summary
Add to Watch List
progress
Type:
New Construction
Applicant:
Michelle Burkart
Status:
Application Submitted
Date Filed:
10/19/2015 2:16:48 PM
Closed:
No
Description
EXTERIOR work of a new construction three (3) story wood framed shell building that will be constructed to provide an additional 15 elderly apartment units under separate permit per plans. No use and occupancy under this permit.
902 Piety St ·Renovation (Non-Structural) · Permit #15-31388-RNVN ·Ref Code: T4PYVL
Download (3)
Print Summary
Add to Watch List
progress
Type:
Renovation (Non-Structural)
Applicant:
Bailey Smith
Status:
Permit Issued
Date Filed:
10/19/2015 12:59:13 PM
Closed:
No
Description
Creation of a whitebox in an existing vacant space - repair existing commercial building - repair/replace door, door jam, replace window, replace paneling with bead board, install floor covering per HDLC.No use and occupancy under this permit. NO electrical. No mechanical.
1623 Oretha Castle Haley Blvd·Renovation (Non-Structural) · Permit #15-31262-RNVN ·Ref Code: 1QPLL5
Pay Fees
Download (6)
Print Summary
Add to Watch List
progress
Type:
Renovation (Non-Structural)
Applicant:
Ernest Stalberte
Status:
Permit Approved
Date Filed:
10/16/2015 2:42:07 PM
Closed:
No
Description
Non-structural renovation to mixed use building (two residential/two commercial). Windows, stucco work, doors, painting and trim.
6500 Magazine St·Renovation (Non-Structural) ·Ref Code: 0DHKWY
Download (4)
Print Summary
Add to Watch List
progress
Type:
Renovation (Non-Structural)
Applicant:
Laura Filipek
Status:
Zoning Review
Date Filed:
10/16/2015 11:16:49 AM
Closed:
No
Description
Renovation/Buildout of non load bearing CMU walls within a pizza kitchen designed and permitted in a previous phase. New site work including new concrete slabs for cabana canopies, power outlets, a shower tower, and site lighting.
Offices Taking over old Lord and Taylor Space in Benson Tower
1400 Poydras St·Renovation (Structural) ·Ref Code: B8BTZV
Type:
Renovation (Structural)
Applicant:
Juan Burciaga
Status:
Appication Submitted
Date Filed:
10/19/2015 5:44:48 PM
Closed:
No
Description
Renovation of existing Mercantile space to a white box with intended Business use.
Applicant:
Juan Burciaga
Subdivision:
Next Status:
Application Review
Next Status Date:
10/22/2015 5:44:48 PM
Next Inspector:
Total Fees:
22710.00
Unpaid Fees:
22710.00
Filing Date:
10/19/2015 5:44:48 PM
4600 Washington Ave·Renovation (Structural) ·Ref Code: L415JM
Download (2)
Print Summary
Add to Watch List
progress
Type:
Renovation (Structural)
Applicant:
Hieu Duy Than
Status:
Application Submitted
Date Filed:
10/19/2015 9:45:19 AM
Closed:
No
Description
Construct 1-story addition to restaurant as per plans.
930 Tchoupitoulas St·Renovation (Structural) ·Ref Code: MV6NY7
Download (1)
Print Summary
Add to Watch List
progress
Type:
Renovation (Structural)
Applicant:
Brooks Graham
Status:
Application Submitted
Date Filed:
10/17/2015 8:00:52 AM
Closed:
No
Description
Renovation of the exterior wall on S. Diamond Street only. Interior renovation under separate permit no.15-26358-RNVS.
839 Clouet St·Renovation (Structural) ·Ref Code: HFM5YD
Download (1)
Print Summary
Add to Watch List
progress
Type:
Renovation (Structural)
Applicant:
Alexander Adamick
Status:
Application Submitted
Date Filed:
10/13/2015 2:58:38 PM
Closed:
No
Description
Renovation of existing 3 unit apartment building.
4427 S Robertson St·Renovation (Structural) ·Ref Code: WYH8PM
Download (1)
Print Summary
Add to Watch List
progress
Type:
Renovation (Structural)
Applicant:
Beth Hood
Status:
Application Submitted
Date Filed:
10/14/2015 10:18:43 AM
Closed:
No
Description
Tenant improvement: Expansion of Home Training suite in existing dialysis facility as per plans
4001 Behrman Hwy·Renovation (Structural) ·Ref Code: V2W6T7
Download (1)
Print Summary
Add to Watch List
progress
Type:
Renovation (Structural)
Applicant:
Brittany Lewis
Status:
Application Submitted
Date Filed:
10/14/2015 3:37:41 PM
Closed:
No
Description
Remodel of existing Walmart store as per plans.
916 Navarre Ave·Renovation (Structural) ·Ref Code: 4RLAUE
Download (1)
Print Summary
Add to Watch List
progress
Type:
Renovation (Structural)
Applicant:
Todd James
Status:
Application Submitted
Date Filed:
10/15/2015 3:45:31 PM
Closed:
No
Description
WYES TV-12 Phase 2 - Production Studio Addition: Demolish one-story portion of existing building and Construct addition to and renovate existing TV studio building as per plans.
825 Baronne St·Interior Demolition · Permit #15-30319-DEMI ·Ref Code: VG6JNX
Download (4)
Print Summary
Add to Watch List
progress
Type:
Interior Demolition
Applicant:
Hauss Builders
Status:
Permit Issued
Date Filed:
10/8/2015 4:16:52 PM
Closed:
No
Description
Interior demolition of a 3 story single dwelling inorder to see structural condition and cleaning. No exterior work allowed and plans for renovation to follow.
717 Girod St·Renovation (Structural) ·Ref Code: MUDKHY
Print Summary
Add to Watch List
progress
Type:
Renovation (Structural)
Applicant:
Brooks Graham
Status:
Application Submitted
Date Filed:
10/17/2015 7:47:43 AM
Closed:
No
Description
Conceptual review only by the ARC of the HDLC. No building permit is requested with this application.
Applicant or Agent: 2223 Carondelet, LLC
Property Location: 2223 Carondelet Street Zip: 70113
Bounding Streets: Carondelet St., Jackson Ave., Philip St., & Brainard St.
Former Zoning: RM-4 Multiple-Family Residential District
Current Zoning: HU-RM1 Historic Urban Multi-Family Residential District
Historic District: Garden District Planning District: 2
Existing Use: Vacant Lot Square Number: 243
Proposed Use: Multi-Family Residence Lot Number: 15
Project Planner: Brittany B DesRocher (bbdesrocher@nola.gov)
Request Citation: This request is for a variance from the provisions of Article 4, Section 4.12.7 (Table
4.L) of the former Comprehensive Zoning Ordinance.
Request: To permit the construction of an 18 unit multi-family residence with insufficient lot area per
dwelling unit.
TEM 6 – Docket Number: 184-15
Applicant or Agent: Susan Neely
Property Location: 1421 N. Robertson Street Zip: 70116
Bounding Streets: N. Robertson St., Esplanade Av., Kerlerec St., & N. Claiborne Av.
Former Zoning: HMC-2 Historic Marigny/Tremé Commercial District
Current Zoning: HMR-3 Historic Marigny/Tremé/Bywater Residential District
Historic District: Treme Planning District: 4
Existing Use: Vacant Lot Square Number: 629
Proposed Use: Restaurant Lot Number: 1
Project Planner: Larry Massey (lwmassey@nola.gov)
Request Citation: This request is for a variance from the provisions of Article 15, Section 15.2.1 (Table
15.A) of the former Comprehensive Zoning Ordinance.
Request: This request is to permit the construction of a restaurant with insufficient off-street parking.
ITEM 18 – Docket Number: 192-15
Applicant or Agent: Park Investment Properties LLC, Sarpy Development, LLC
Property Location: 923 Julia Street Zip: 70113
Bounding Streets: Julia St., Dryades St., Girod St., & Baronne St.
Zoning District: CBD-5 Urban Core Neighborhood Lower Intensity Mixed-Use District
Historic District: Lafayette Square Planning District: 1a
Existing Use: Vacant Lot Square Number: 257
Proposed Use: Multi-Family Residence Lot Number: 6 & 7
Project Planner: Brittany B. DesRocher (bbdesrocher@nola.gov)
Request Citation: This request is for variances from the provisions of Article 17, Section 17.3.B.1, and
Article 17, Section 17.6.D.9 of the Comprehensive Zoning Ordinance.
Request: This request is to permit the construction of a multi-family residence with no ground-floor
uses and with a garage entrance on a pedestrian street.
3001 Napoleon Ave·Design Review · Project #DR091-15 ·Ref Code: 04WB6M
Download (5) Print Summary SubmitAdd to Watch List
Type:
Design Review
Applicant:
Alvin C Bertucci
Status:
Completeness Review
Date Filed:
9/4/2015 3:38:21 PM
Closed:
No
Description
Design of a standard restaurant with addtional rental space. Sqaure 694 Lot 1,2,3 and pt 4
DESIGN REVIEW 92/15 - Request by Charles Silbernagel, AIA for the
new construction of three-story office building in the Character Preservation Corridor.
The municipal address is 4111 MAGAZINE ST.
[15-1585] A request by Jim Baumback for a grant of predial servitude
for the proposed encroachment of a gallery on/over the Magazine Street public right-ofway,
at 1831 Magazine Street.
[ZD106/15] Request by 1770 TCHOUPITOULAS, LLC for a
Conditional Use to allow a mini-warehouse in an MU-2 High Intensity Mixed-Use
District and the RIV Riverfront Design Overlay District, on the entirety of Square 34 in
the First Municipal District, bounded by Tchoupitoulas, Celeste, Water, and Nuns Streets.
The municipal address is 1770 TCHOUPITOULAS STREET. (PD 2)
200 Decatur Street renovations
City Celebrates Opening of New Rosenwald Center in the B.W. Cooper Neighborhood
OCTOBER 20, 2015
NEW ORLEANS – Today, Mayor Mitch Landrieu, City and State officials and FEMA celebrated the opening of the new $8.5 million Rosenwald Center at 1120 South Broad Street in the B.W. Cooper neighborhood. This New Orleans Recreation Development Commission (NORDC) recreation center replaces the previous facility that was destroyed by Hurricane Katrina. Construction on the $1.8 million outdoor Rosenwald Pool and Pool House will begin next month and open next summer.
The Rosenwald Center is the third new NORDC recreation center to open this year. Over the summer, the City and NORDC celebrated the openings of the Sanchez Center at 1616 Caffin Street in the Lower Ninth Ward and the Stallings St. Claude Center at 4300 St. Claude Avenue in the Bywater.
“Today, we celebrate another sign of renewal and reinvestment with the reopening of the Rosenwald Center in the B.W. Cooper neighborhood,” Mayor Mitch Landrieu said. “Once again, our young people have a safe place to grow, learn and play and I encourage New Orleanians of all ages to take advantage of it and all the valuable resources it will offer. Ten years ago, Hurricane Katrina brought New Orleans to its knees but today we are standing taller than ever. This project is a symbol that we are building back better than before.”
Since Mayor Landrieu took office in 2010, the City has invested over $157 million in new and improved NORDC facilities and nearly tripled its programming budget. In 2010, about 500 young people learned to swim at eight NORDC pools but this year nearly 4,000 learned at fifteen pools. Also in 2010, only 1,600 children participated in four NORDC summer camps but as of this summer, 5,100 children participated at 49 youth and teen camps across New Orleans. In 2010, New Orleans only had four NORDC recreation centers open to the public. Today, there are ten.
Click here to learn more about NORDC and its programs external link
Cibugnu Rebrands Into Pop Up & Party Space 709 Events
http://nola.eater.com/2015/10/20/957...ace-709-events
City Approves Susan Spicer's Upcoming Mid City Restaurant
http://nola.eater.com/2015/10/20/957...ity-restaurant
Ritz Carlton renovations and upgrades have started on bottom retail spaces. Restaurant and Davenport lounge are supposedly going to be relocated down there . Will make the property much more engaging from street level
New Orleans public transit update: 5 projects
Transdev and the RTA have sent an army of engineers to the foot of Canal Street to find a way to untangle one of New Orleans more knotted intersections. Augustine didn't go into too much detail Monday, but he said plans could include a streetcar spur headed upriver and a traffic circle to alleviate some of the confusion where Convention Center Boulevard runs into Canal Street.
The redo of that intersection, however, will likely rely on federal government financing, Augustine said. Transdev is waiting to hear the results of its latest application to the Transportation Investment Generating Economic Recovery grant program.
5. Downtown transit center
After collecting public comments, complaints and questions for months, a consultant to the RTA is expected to recommend its best choice for a new downtown transit center that would shelter commuters as they wait for buses and streetcars.
Augustine said he expects the consultant will make its recommendation to the RTA board in December.
The engineering firm Parsons Brinkerhoff presented four possible sites in July:
on Basin Street near Canal Street;
on Rampart Street upriver from Canal Street;
Duncan Plaza across from City Hall near Perdido Street and Loyola Avenue; and
the Canal Street neutral ground between Rampart and Dauphine Street.
Once the necessary agencies approves a site, an environmental assessment would be the next step toward applying for federal grants to pay for the center. Transdev has said it would like to build it before the city's tricentennial in 2018.
http://www.nola.com/traffic/index.ss...ans_publi.html
OCTOBER 16, 2015
Second facility dedicated to serving New Orleans’ seniors to open this year
NEW ORLEANS – Today, Mayor Landrieu, City officials and FEMA celebrated the opening of the new $3.4 million Carrollton Hollygrove Senior Center facility at 3300 Hamilton Street. The new senior center is the second facility dedicated to serving New Orleans’ seniors to open this year, following the opening this summer of the Lower Ninth Ward Senior Center in the new Sanchez Center in the Lower Ninth Ward.
“The new multi-purpose Carrollton Hollygrove Senior Center is open to the public and will once again serve as an important anchor to this neighborhood,” said Mayor Mitch Landrieu. “Our seniors deserve a top notch facility. Together with the New Orleans Council on Aging and FEMA, we have delivered on that promise to provide quality activities and important resources for our seniors. As one of my administration’s committed capital projects, this is another example that we’re building a stronger, more resilient New Orleans that meets our community’s needs.”
Recent Construction Pictures from around town:
Trader Joes and Shopping Center:
Dave and Busters garage"
Gallier Hall renovations:
Cambria Suites:
Future Emerils Restaurant Meril's:
Ace Hotel:
201 South Villere
ACE HOTEL Sign
Stirling Opens Fremaux Phase II, Adding 280,000 More Square Feet To Slidell’s Shopping Megaplex
http://canalstreetbeat.com/stirling-...ping-megaplex/
The Crab Trap Opens on The Frenier Lakefront
http://nola.eater.com/2015/10/15/954...nier-lakefront
Floorplan for new bar restaurant connected to Ace Hotel at 630 carondelet
Tchoupitoulas Beer Garden Opens In The Warehouse District This Week
http://nola.eater.com/2015/10/21/958...t-october-2015
3940 Thalia St·Renovation (Non-Structural) ·Ref Code: ML36M3
Download (2)
Print Summary
Add to Watch List
progress
Type:
Renovation (Non-Structural)
Applicant:
Broad Strokes LLC
Status:
Application Submitted
Date Filed:
10/21/2015 11:03:33 AM
Closed:
No
Description
Renovate vacant space into a shell only as per plans. Use and occupancy shall require a separate permit. No exterior work under this permit.
12000 I 10 E Service Rd·Renovation (Non-Structural) · Permit #15-31611-RNVN ·Ref Code: 22J1AC
Download (3)
Print Summary
Add to Watch List
progress
Type:
Renovation (Non-Structural)
Applicant:
Paul McGoey
Status:
Permit Issued
Date Filed:
10/21/2015 8:26:28 AM
Closed:
No
Description
Non-structural renovation to existing restaurant for new restaurant tenant(New Orleans Hamburger and Seafood Company) as per plans.