Quote:
Originally Posted by Mr Roboto
Only 2 billion out of the 29 is for transit? Thats pretty weak.
|
It's a statewide construction program that also includes school construction, university funding, and quite a bit of highway resurfacing work, bridge replacement, and additional lanes - but not the infamous "roads to nowhere". Also, Huffington Post puts the amount at $26 billion, not 29.
That huge amount, by the way, is only the total amount that will be spent, including all Federal money. In fact, IL is only contributing $12 billion out of the 26, to satisfy their requirement for matching funds in order to receive the other $14 billion in Federal dollars that are waiting.
Although I'm sure the figures vary from article to article, Huffington Post also reports that Illinois' contribution for roads is $2.8 billion and their contribution for transit is $2 billion. Looking at these figures, I'd say this is actually a budget heavily in favor of transit, considering the proportion of auto trips to transit trips in the state. These monetary amounts will probably double when Federal funding is factored in. And, since this bill creates dedicated sources of funding for capital construction, this ensures a relatively steady supply of money for construction in the near future.
-------------
As far as transit expansions go, I think CTA's line extensions are farthest along. Orange and Yellow, and soon Red, will begin their Environmental Impact Surveys and, once those are completed, Federal funding is imminent. I have not yet heard a cost estimate for Red, but Orange and Yellow combined is roughly $550 million. Given a state-Federal funding match of 40-60, IL will be responsible for 40% of this cost, or $220 million. This amount does not seem exorbitant, and I'm sure it can be worked into the budget.
Metra will also probably try to get their UP-W and UP-NW expansion plans funded. Despite the rhetoric about the STAR line, I'm pretty sure Metra realizes that this money is best spent on upgrading their 3rd- and 6th-busiest lines, which are running at full capacity right now. These two projects are also quite far along, also in their EIS phase and nearly ready for Federal funding.
EDIT - underreported the orange line cost, added $100 mil to the figures