Quote:
Originally Posted by drummer
Is this going the length of the block (from Davis St. to Driskill St.)?
|
It certainly looks like it, but that means they're still a ways away from construction. The north side of the block would still need to be demoed before doing anything. Whereas the south side is just a parking lot right now.