HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Edmonton


Reply

 
Thread Tools Display Modes
     
     
     
     
  #1  
Old Posted Aug 14, 2007, 12:42 AM
feepa's Avatar
feepa feepa is offline
Change is good
 
Join Date: Oct 2005
Posts: 8,411
That might be awhile... lol if you want, I'll update either this thread, or my first 3 posts in the current stickied thread with your stylings.
Reply With Quote
     
     
  #2  
Old Posted Aug 14, 2007, 12:44 AM
Xelebes's Avatar
Xelebes Xelebes is online now
Sawmill Billowtoker
 
Join Date: Nov 2006
Location: Rockin' in Edmonton
Posts: 13,936
That's the idea. That way, I can work on cleaning up my own thread on SSC and do any of the necessary modifications before I post it on here.
Reply With Quote
     
     
  #3  
Old Posted Aug 31, 2007, 4:24 AM
itom 987's Avatar
itom 987 itom 987 is offline
Moderator
 
Join Date: Aug 2003
Location: Edmonton
Posts: 5,047
I'll help out when needed.
Reply With Quote
     
     
  #4  
Old Posted Sep 12, 2007, 3:50 PM
sask1982's Avatar
sask1982 sask1982 is offline
Registered User
 
Join Date: Sep 2002
Location: Regina, Saskatchewan
Posts: 910
Has any of the WEM expansion begun?
Reply With Quote
     
     
  #5  
Old Posted Sep 12, 2007, 8:59 PM
feepa's Avatar
feepa feepa is offline
Change is good
 
Join Date: Oct 2005
Posts: 8,411
^^ Conversation in the other thread please. WEM has not started its expansion plans yet. (I doubt they do much in these high cost times...)
Reply With Quote
     
     
  #6  
Old Posted Sep 12, 2007, 9:52 PM
Wooster's Avatar
Wooster Wooster is offline
Round Head
 
Join Date: Nov 2003
Posts: 12,688
Why could this not just be the first page of the construction thread, continually edited, instead of wasting space as a sticky thread? Boris does it just fine for the Calgary one.
Reply With Quote
     
     
  #7  
Old Posted Sep 12, 2007, 10:28 PM
feepa's Avatar
feepa feepa is offline
Change is good
 
Join Date: Oct 2005
Posts: 8,411
Quote:
Originally Posted by josh white View Post
Why could this not just be the first page of the construction thread, continually edited, instead of wasting space as a sticky thread? Boris does it just fine for the Calgary one.
"wasting space" "do like boris does" "must follow what the Calgary thread does"
Just because one person does it, doesn't mean it has to be followed or that its the correct way of doing things. If you want to look at the correct way of doing things based on what other cities do, both these threads should be in the City Compilations section...

Many people have suggested creating a separate thread for the renderings. Why doesn't Boris follow my lead, and create a separate thread for Calgary renders?

You want to talk about wasting space? How about those numerous posting parties back in the days of the post limit of 2000, where the last 150 or so posts (of the Calgary C thread) would be a complete waste of time, just so you could turn to a new thread ...

What does it matter? Wasting space on the internet... There's a new one. "Oh no, I have to scroll a quarter roll to get below the 1 extra stickied thread" Surely you've spent a heck of lot more time parasing through the garbage posts at the end of the Calgary threads in search of real information then having to look past this one stickied thread... to me, you sound like your just looking to whine about something.

Anyways... I think "we" will be reverting back to the original formula to "do like boris does" when the next thread starts. Xelebes should be ready to go with his new format by then.

Maybe you should create a poll... and figure out what method people think is best...Not everyone is that forum savvy, and may not know how easy it is to find the first page.
Reply With Quote
     
     
  #8  
Old Posted Sep 28, 2007, 3:38 AM
Greco Roman Greco Roman is offline
Movin' on up
 
Join Date: Oct 2006
Location: Edmonton
Posts: 3,449
I know that myself, I am anxious for the East Jasper and Fort Road redevelopments, as I think these areas have so much potential to blossom into vibrant communities.

I also pray that something be done in the Kingsway Mall area where I currently reside, aka the ghetto; you can't even walk down your own street without being harrased for cigarettes or changes, literally every day or every second day.
Reply With Quote
     
     
  #9  
Old Posted Sep 28, 2007, 2:10 PM
WhipperSnapper's Avatar
WhipperSnapper WhipperSnapper is offline
I am the law!
 
Join Date: Sep 2002
Location: Toronto+
Posts: 22,241
The Calgary model of one thread fits all maybe efficient but its hardly welcoming to the casual viewer or a stranger looking for something a little more specific. Exactly how many times in the Calgary thread have newbies been directed to the development portfolio?
Reply With Quote
     
     
  #10  
Old Posted Oct 5, 2007, 2:14 AM
cityguy's Avatar
cityguy cityguy is offline
Registered User
 
Join Date: Jun 2005
Location: Windsor
Posts: 754
I thought it said no discussion.
Reply With Quote
     
     
  #11  
Old Posted Dec 19, 2007, 1:53 AM
kcantor kcantor is offline
Registered User
 
Join Date: Aug 2007
Location: Edmonton
Posts: 2,981


Last edited by kcantor; Dec 19, 2007 at 2:09 AM.
Reply With Quote
     
     
  #12  
Old Posted Dec 19, 2007, 2:00 AM
Coldrsx's Avatar
Coldrsx Coldrsx is offline
Community Guy
 
Join Date: Dec 2003
Location: Canmore, AB
Posts: 67,397
^xie xie
__________________
"The destructive effects of automobiles are much less a cause than a symptom of our incompetence at city building" - Jane Jacobs 1961ish

Wake me up when I can see skyscrapers
Reply With Quote
     
     
  #13  
Old Posted Dec 27, 2007, 2:36 AM
feepa's Avatar
feepa feepa is offline
Change is good
 
Join Date: Oct 2005
Posts: 8,411
I decided to attempt to combine all 3 images to form one high res image...

Reply With Quote
     
     
  #14  
Old Posted Mar 18, 2008, 1:35 AM
240glt's Avatar
240glt 240glt is offline
HVAC guru
 
Join Date: Sep 2006
Location: YEG -> -> -> Nelson BC
Posts: 11,297
Moved
__________________
Short term pain for long term gain

Last edited by 240glt; Mar 23, 2008 at 3:27 AM.
Reply With Quote
     
     
  #15  
Old Posted Mar 23, 2008, 3:15 AM
240glt's Avatar
240glt 240glt is offline
HVAC guru
 
Join Date: Sep 2006
Location: YEG -> -> -> Nelson BC
Posts: 11,297
Moved
__________________
Short term pain for long term gain

Last edited by 240glt; Mar 23, 2008 at 10:56 PM.
Reply With Quote
     
     
  #16  
Old Posted Mar 23, 2008, 10:55 PM
240glt's Avatar
240glt 240glt is offline
HVAC guru
 
Join Date: Sep 2006
Location: YEG -> -> -> Nelson BC
Posts: 11,297
Moved
__________________
Short term pain for long term gain

Last edited by 240glt; Mar 27, 2008 at 11:37 PM.
Reply With Quote
     
     
  #17  
Old Posted Mar 27, 2008, 11:36 PM
240glt's Avatar
240glt 240glt is offline
HVAC guru
 
Join Date: Sep 2006
Location: YEG -> -> -> Nelson BC
Posts: 11,297
**EDMONTON METRO REGION PROJECTS, PROPOSALS, RENDERINGS AND RUMOURS**




Renderings and new information (such as rumours, proposals, approvals, etc) are added to this first page on a regular basis, as it becomes available. Information that needs updating or changing status, please PM or add it in the discussion thread.
Press "Ctrl-F" if you want to search for projects within this page
Press "Esc" if you want quit loading all the numerous images on this thread.
Press "Ctrl+F5"If some images do not load right away, this will refresh your Web Browser


Edmonton Information:
City Population – 752,412 (2008) Edmonton
CMA Population - 1,034,945 (2006)Edmonton Capital Region
Incorporation as Town - 1892 Incorporation as City - 1904
Total Area- 683.88 km² (2004)
Elevation– 688 m above sea level
Total Area of Parks/Open Spaces - 111 km² (27,400 acres) of parkland. Within a 25 km long river valley park system there are 11 lakes, 14 ravines, and 22 major parks.

Branding/Motto - "City of Champions" "Gateway to the North" "Oil Country"
Mayor – Stephen Mandel (34th Mayor of Edmonton)
Last Municipal Election- Oct. 17, 2007
Next Municipal Election - Oct. 18, 2010


Important Links:
Edmonton
Edmonton Capital Region
Connect2Edmonton - a forum of topics of importance to Greater Edmonton's future.
Focus Edmonton: City Plan
Alberta Ministry of Infrastructure and Transportation
Alberta Ministry of Municipal Affairs and Housing
Edmonton Economic Development
Edmonton Transit
Edmonton SLRT Expansion Site
Edmonton BRT Planning website
Moving Edmonton – Updating the Transportation Master Plan
High Speed Transit Planning Study
Alberta Municipal Government Act
Edmonton Design Committee

Revitalization studies, Park developments and Neighborhood plan Links
105th Avenue Changes
109th Street Corridor Study
Fort Road Old Town Redevelopment,
Capital City Downtown Plan
Strathern Rezoning Application
Downtown East Action Plan Overview
Alberta Avenue Initiative Revitalization Study
Moving forward on the Vision for the Quarters
Terwillegar Park concept study


**COMMERCIAL & GOVERNMENT OFFICE**
12 Floors and over
  1. Epcor Tower - Under Construction
    Developer: Qualico Developments
    Architect: Kasian Architects
    General Contractor: Ledcor
    Location: 101 Street 105 Ave
    Number of floors: 28
    Fly-by Video



  2. Professional Building addition/remodel - Under Construction
    Developer: Procura
    Architect: Arndt Tkalcic Architecture
    Location: Jasper Avenue / Between 108 and 109 st
    Number of floors: 12




  3. Ironwood - Approved
    Developer: Ironwood
    Architect: HIP Architects
    General Contractor: Clark Builders
    Location: 103 Street 102 Ave
    Number of floors: 18


  4. West Edmonton Mall Expansion- Approved
    155,000 sqft expansion of retail space around Entrance 50 and east of the WaterPark
    West Edmonton Mall Parkade Expansion- Approved
    WEM convention centre
    WEM WHL Hockey Arena
    This will include additional retail space, a facility for sports, trade shows and conventions, a 12-story office building, and a 600-unit apartment building, along with more parking.
    WEM Office Building - Rumored
    West Edmnton Mall site Number of floors: 12
    WEM 2nd Hotel - Approved
    Location: West Edmonton Mall site Number of floors: 12

  5. Office tower on Jasper/102st - Proposed
    Developer: Melcor
    Architect: Stantec
    Location: Jasper and 102st
    Number of floors: 23-25
    Last News : Melcor applied to close lane behind property


  6. Office Tower on Jasper and 111 Street Northside - Proposed
    Developer: Canterra Properties
    Location: Jasper and 111st Number of floors: 12
    Last news: Servus bank demo'd, Initial design shot down, Currently utilized as parking lot

  7. Bell Tower 2 - Proposed
    Developer: Oxford Properties
    Location: 101st 104ave (Staples Lot)
    Number of floors: 20-30

  8. BMO Tower Replacement - Proposed
    Developer: GE Energy
    Location: Jasper Ave 101 Street
    Number of floors: 20-25


  9. Petroleum Plaza Retrofit/ Addition - Proposed
    Location: 108 Street 100 Ave
    Number of floors: 12



  10. Canada Place Addition/ 3rd Phase - Rumored



    others???
    jasper 101st - 400,000 - GWL
    Manulife 2?
    Sunlife?


**MIXED USE RESIDENTIAL & COMMERCIAL**
  1. Cascadia - Proposed
    Developer: Procura
    Location: 109 st, between 100 ave &Jasper
    Number of floors: 12/8/6

  2. Mayfair Village - Proposed
    Developer: Procura
    Location: 109 st & Jasper Ave, South east corner
    Number of floors: 12





  3. StationLands - Proposed
    Developer: Qualico Developments Last News: Project underway with Epcor Tower being the first phase.
    Architect: Kasian Architecture
    Location: North of CN Tower along 105 avenue between 101 street, and 97 Street
    Number of floors:
    Tower A 3 149 m 34 Tower C 1 69 m 15
    Tower B 2 149 m 37 Tower D 2 69 m 21




  4. Paramount tower - Proposed
    Developer: Procura
    Location: Jasper ave & 103 street
    Number of floors: 40 mixed use


  5. Urbia Tower - Proposed
    Developer: Urbia Developments
    Architect: GMH Architects
    Location: 104 Ave 102 Street
    Number of floors: 28



**HIGH RISE RESIDENTIAL**
  1. Century Park - Under Construction - Last News: full build out over many years
    Developer: Westbank Projects Corp and Procura
    Architect:James KM Cheng and Arndt Tkalcic Architecture

    Location: Former Heritage Mall Site, East side of 111th Street, North of 23rd Avenue
    Total Floor Count Century Park: 232
    Tower 1 - 20 Floors Tower 2 - 18 Floors
    Tower 3 - 18 Floors Tower 4 - 20 Floors
    Tower 5 - 24 Floors Tower 6 - 24 Floors
    Tower 7 - 24 Floors Tower 8 - 24 Floors
    Tower 9 - 12 Floors Tower 10 - 20 Floors
    Tower 11 - 16 Floors Tower 12 - 12 Floors




  2. The Icon
    Tower 1
    - Under Construction
    Tower 2Under Construction
    Developer: Langham Properties
    Architect: Brinsmead Ziola Kennedy Architecture
    Location: 104th Street between 102 Avenue and Jasper Avenue
    Number of floors: Tower 1 - 30 Tower 2 - 35


  3. The Q - Under Construction
    Developer: Regency Developments
    Architect: Brinsmead Ziola Kennedy Architecture
    Location: 105st 104ave tower
    Number of floors: 24





  4. Uptown - Under Construction
    Developer:True North Properties
    Architect: Sylvie Perrault
    Location: Between Jasper Ave and Victoria Park Rd on 117 Street NW
    Number of floors: 15 Floors



  5. Vivacity - Under Construction
    Developer: True North Properties
    Location: 104th Street, North of 98 Avenue
    Number of floors: 18

  6. Alta vista 2 - Under Construction
    Developer: Christenson Developments
    Location: Railtown (South of 104th avenue on 111th Street)
    Number of floors: 12


  7. Shepherds' Gardens - Under Construction
    Developer: Shepherds Care Foundation
    General Contractor: True North Properties
    Location: 28 Ave 66 Street Number of Floors: 15


  8. Serenity - Under Construction
    Developer: Urban Landmarks
    Architect: CSG and Brinsmead Ziola Kennedy Architecture
    Location: Jasper Ave + 118 Street (Former Mcdonalds location)
    Number of floors: 12


  9. Meridian - Under Construction
    Location: 111st north of jasper ave
    Number of floors: 10




  10. AuroraApproved
    Developer: Urban Landmarks
    Architect: Brinsmead Ziola Kennedy Architecture
    Location: 102st to 104st from 105ave-106ave
    Last news: Tower 1 "Mira" marketing underway
    Aurora - Building D 28 floors Aurora - Building E 28 floors
    Aurora - Building F 25 floors Aurora - Building B 23 floors
    Aurora - Building C 23 floors Aurora - Building A 17 floors



  11. Arlington + Tower - Approved
    Architect: Brinsmead Ziola Kennedy Architecture
    Location: 100ave 106st
    Number of floors: 20
    Last news: Project delayed/on hold
    http://www.vueweekly.com/articles/default.aspx?i=1964




  12. Concert Properties Jasper Ave 124 st - Approved
    Developer:Concert Properties
    Location: Jasper Ave west of 124st
    Number of floors: 11
    Lat news: Project delayed/on hold




  13. Glenora Towers - Approved
    Architect: Brinsmead Ziola Kennedy Architecture
    Location: 142 Street, Stony Plain Road
    Number of floors: Glenora Tower 1: 17 Glenora Tower 2: 13 Glenora Tower 3: 11 Glenora Tower 4: 11 Glenora Tower 5: 8




  14. Strathern Heights - Approved
    Architect: Sturgess Architecture
    Number of floors:
    Strathern Heights Tower 1: 19
    Strathern Heights Tower 2: 17
    Strathern Heights Tower 3: 17
    Strathern Heights Tower 4: 17



  15. Opus - Approved
    Architect: Brinsmead Ziola Kennedy Architecture
    Location: 104 St 98 Ave
    Number of Floors: 26


  16. Rossdale Green - Approved
    Developer: Communitas
    Architect: Hartwig Architecture
    Location: 105st 96ave
    Number of floors: 12



  17. Valleyview Tower - Approved
    Developer: Vinterra Properties
    Location: East Jasper
    Number of floors: 16







    Mondrian - Approved
    Developer: Arcus Developments
    Architect: Kirkor Architects with Assisting with EDC
    Location: 109 Street & 105 Ave
    Number of floors: Tower 1: 13 Tower 2: 13
    Last news: Project on hold/delayed- Property for sale



  18. Azure Lofts- Approved
    Developer: Procura
    Architect: Arndt Tkalcic Architecture
    Location: Jasper Ave 110 Street


  19. The Oliver- Approved
    Developer: Architect: CW Tse Architects and ISL Engineering and Landscape Architecture.
    Location: 10024 110 Street
    Number of Floors: 14



  20. Parkwood Tower Proposed
    Architect: BZKA
    Location: 105 St & 97 Ave
    Number of floors: 26




  21. 5th Avenue Vista Proposed
    Developer: Christenson Developments
    Location: 105th Ave & 111-112 St
    Number of floors: Tower 1= 15 Tower 2= 15


  22. Bellamy Hill Tower -Proposed
    Developer: Trans America Group
    Architect: Holland Roth Architects
    Location: Bellamy Hill
    Number of floors: 32


  23. Founder's Ridge - Proposed
    Developer: BCM Developments Ltd
    Architect: Hartwig Architecture Inc
    Location: 105st 98ave
    Number of floors: 28



  24. East Hampton Rise - Proposed
    Developer: Guild Developments
    Architect: Richard Fairbanks Architects
    Location: 5351 199 St
    Floors: Tower 1: 19 Tower 2: 19


  25. Tango - Proposed
    Architect: BZKA
    Location: Jasper Ave & 84 Street Floors: 26



  26. Rain Tree - Proposed
    Architect: BZKA
    Location: East of Legislature Grounds Floors: 32





  27. Clifton Place - Proposed
    Location: High Street & Stoney Plain Road
    Floors: 15


  28. The Edmontonian - Proposed
    Developer: BCM Developments Ltd
    Location: 101 street & 106 Ave
    Number Floors: 42



  29. RK East - Proposed
    Developer: RK Develpments
    Location: 85 Street South of Commonwealth Stadium




  30. The Pearl - Proposed
    Location: Jasper Ave 119 Street
    Number of Floors: 35




  31. 10406 98 ave - Proposed
    Location: 10406 98 ave
    Number of Floors: 25


  32. Viking Arms - Proposed
    Location: Southgate
    Number of Floors: 35



  33. China Town Condo - Proposed
    Location: 105ave/98 Street
    Number of floors: 13

  34. The Pines - Proposed
    Developer: Westcorp
    Location: 51 Ave
    Number of floors: 16



  35. Red Leaf Bellamy Hill Tower - Rumored
    Developer: Red Leaf Developers
    Location: 99ave Bellamy hill

  36. 103ave/105st tower - Rumored
    Architect: Brinsmead Ziola Kennedy Architecture
    Location: 104ave/105st
    Number of floors:21

  37. The New North - Proposed
    Developer: Alldritt Homes LTD
    Location: Clairview
    Number of Floors: TNN Tower 1: 12 TNN Tower 2: 12 TNN Tower 3: 12 TNN Tower 4: 12

  38. Corner 1 Towers - Proposed
    Developer: BCM Developments Ltd
    Location: jasper ave 95st
    Number of floors: 22

  39. Charles Campsell Old Hospital site- Proposed
    Developer: Architect: Gene Dub
    Location: 12700 114 Street.


  40. Crown Plaza Condo Tower - Rumored
    Architect: Stantec
    Location: 100ave 101st
    Number of floors: 40 (rumoured)


**LOW RISE COMMERCIAL/ GOVERNMENT/ RETAIL**
  1. Alberta Motor Association (AMA) Office - Under Construction
    Architect: Arndt Tkalcic Architecture
    Location: 109 Street Kingsway Ave
    Number of floors: 3



  2. Kinsway Mall Renovation - Under Construction
    Developer: Oxford Properties
    General Contractor: Ledcor
    Location: 109 Street Kingsway Ave
    Number of floors: 3


  3. Southgate Centre Renovation - Under Construction
    Developer: Ivanhoe Cambridge
    Location: Whitemud Drive & 111 Street
    Number of floors: 3

  4. Windermere - Under Construction
    Developer: Harvard Developments
    Architect: Kasian
    Planner: Stantec
    Location: South of Anthony Henday, on Tewillegar
    Number of floors: Various


  5. Coronation Plaza - Approved
    Location: 142 Ave 111 Sreet
    Number of floors: 4


  6. Boardwalk Market Redevelopment - Approved
    Architect: Stantec Architecture
    Location: 10310 102 Ave
    Number of floors: 4

  7. Westcorp Office - Proposed
    Developer: Westcorp
    Architect: Templar Architecture
    Location: 10013 101A Ave
    Number of floors: 4




**LOW RISE RESIDENTIAL**
  1. Time Square - Under Construction
    Developer: Aman Building Corporation
    Location: 106st and 102ave
    Number of floors: 4


  2. The Venetian- Under Construction
    Developer: URL="http://www.abbeylanehomes.com/"]Abbey Lane[/URL][/B]
    Architect: CSG Location: Old site of Sidetrack Cafe on 104th Avenue
    Number of floors: 6
    http://www.virtualtourcanada.com/~abbeylane/venetian_living.htm



  3. The Zen - Under Construction
    Developer: BCM Developments Ltd
    Architect: GMH Architects
    Location: 114st and 105ave Number of floors: 6



  4. SoHo in Cloverdale - Under Construction
    Developer: Time developments
    Location: Cloverdale
    Number of floors: 4


  5. Center in the Park - Under Construction
    Developer: Christenson Developments
    Location: Sherwood Park - Sherwood Drive near County Hall
    Number of floors: 4





  6. M-TRAC - Under Construction
    Location: 105 Ave East of 116st
    Number of floors: 5


  7. Trinity Pointe - Under Construction
    Developer: Time developments
    Location: whyte and 87st ish



  8. King Street on the ParkUnder Construction
    Developer: Renoir
    Location: King Street, Spruce Grove
    Number of floors: 9


  9. The Knoll Building Condo Conversion (Morris Lofts) - Under Construction[SIZE=1]
    Location: East side of 104 Street, North of Jasper Avenue
    Number of floors: 4

  10. Lessard House - Under Construction
    Developer: WAM Development Group
    Architect: Kasian
    Location: Victoria Promenade & 119 st
    Number of floors: 6


  11. Gates on 17th - Under Construction
    Location: 117st and 105/106ave
    Number of floors: 4



  12. Belmonte Place - Approved
    Developer: J.J. Max Developments
    Location: 10767 95 Ave.
    Number of floors: 4


  13. Edge - Approved
    Developer: Time developments
    Architect: Brinsmead Ziola Kennedy Architecture
    Location: Oliver area (117street)
    Number of floors: 6



  14. Allendale Condo Proposed
    Architect: Brinsmead Ziola Kennedy Architecture
    Location: 6120 104 ST




  15. Essence Proposed
    Developer: Time developments
    Location: south of jasper around 112 street

  16. Maxx Under Construction
    Developer: BCM Developments
    Location: 10540 113 Street
    Number of floors: 6


**EDMONTON'S EDUCATIONAL, MEDICAL, RECREATIONAL, ENTERTAINMENT AND ARTS FACILITY CONSTRUCTION**

EDUCATIONAL FACILITIES


University of Alberta
  1. University of Alberta Faculty of Science (CCIS) - Under Construction
    Architect: O'Neill O'Neill Procinsky Architects
    General Contractor: ]PCL
    Location: University- Saskatchewan Drive



  2. Edmonton Clinic North and Edmonton Clinic South - Under construction
    Developer: University of Alberta/ Capital Health
    Architect: HOK Architects/ Callison Architects
    Location: W of 114street West of U of A





    Northern Alberta Institute of Technology
  3. NAIT Ralph Klein campus - Proposed
    Location: S of Ellersiele Rd, E of QEII



  4. NAIT Center for Buisness - Proposed
    Developer: ? Architect: ? Location: ? Number of floors: 5


  5. Grant MacEwan Arts Centre - Proposed
    Location: 104ave 111st

  6. Norquest College - 3 buildings Proposed
    Architect: Cohos-evamy
    Location: 103 ave 107/108st





    MEDICAL FACILITIES

  7. Royal Alex Hospital - Lois Hole Expansion (Center for Women) - Under Construction
    Architect: Cohos-evamy
    Location: Royal Alexandra
    Hospital Number of floors: 9



  8. Royal Alexander Hospital New Orthopedic Clinic - Under Construction
    Location: 109A Ave 102 street
    Number of floors: 6


    RECREATIONAL, ENTERTAINMENT AND ARTS FACILITIES

  9. Art Gallery of Alberta Under Construction
    Architect: Randall Stout, HIP Architects
    Location: 99st 103ave
    Number of floors:4



  10. Ukrainian Canadian Archives & Museum of Alberta (UCAMA) Under Construction
    Architect: HIP Architects
    General Contractor: Delnor Construction
    Location: Jasper ave 96st
    Number of floors: 3



  11. Royal Alberta Museum Renovations - Proposed
    Architect: Cohos-evamy




  12. Northlands AgriCom Expansion- New Building - Under Construction
    Northlands AgriCom Expansion- Renovation - Approved
    Developer: Northlands Architect: Cohos-evamy
    Location: 118th Ave & 75 th St
    Number of floors: 3


  13. Downtown Arena / Recreation complex - Rumoured
    Last news: Feasability report just released recommending dowtown placement of an arena.
    Drawing shows possible post office site.



**EDMONTON TRANSPORTATION AND INFRASTRUCTURE CONSTRUCTION**


Edmonton International Airport
2007 - 2012 Expansion Project
An additional 13 bridges will be built on the south side of the terminal, boosting the total number of bridges to 30 from the current 17.
Phase 1 (completion date 2010): 253,000 square metres of new apron space to accommodate new south terminal development.
Phase 2 (completition date 2010): A new "hammerhead" located south of the current airport terminal.
Phase 3 (completion date 2012): A new concourse linking the existing south terminalwith the "hammerhead."
Source: Edmonton International Airport Expansion







New airport hotel
A 192-room Courtyard by Marriott hotel will also begin construction in 2008. The costs for this project will be borne by the developer, Concord Hospitality Enterprises Company, and is not part of the $1 billion airport expansion.
Source: Edmonton International Airport Expansion




Edmonton LRT Construction



South LRT (SLRT)
The extension will occur over three phases.
Phase 1: Health Science Station Opened January 2006
Phase 2: Health Sciences Station to South Campus Station opens by the end of 2008
Phase 3: South Campus Station to Century Park opens by the end of 2009



Health Science Station - Opened Jan 2006



Belgravia/Mckernan (76 Ave) Station - Late 2008?



Neil Crawford Station (UofA South Campus) - Late 2008



Southgate Station - Late 2009



Whitemud LRT Bridge



Century Park Station - Late 2009


West LRT (WLRT)

3 Different possible routes exist
1. Lewis Estate to Health Sciences
2. Lewis Estate to South Campus
3. Lewis Estate to Downtown


North LRT (NLRT)




South East BRT
http://www.edmonton.ca/RoadsTraffic/...%20options.pdf
http://www.edmonton.ca/RoadsTraffic/...%20options.pdf



Edmonton Freeway/Major Road Construction

Anthony Henday Drive


Anthony Henday SW
The southwest component of Anthony Henday Drive opened in fall 2006.
http://www.infratrans.gov.ab.ca/INFT...2006update.pdf
Photos: http://www.infratrans.gov.ab.ca/INFT...2006Photos.htm
http://www.infratrans.gov.ab.ca/INFT...tusNov2005.pdf


Anthony Henday NE - Proposed
2011 for start and beyond. Maybe 2015 before completion


Anthony Henday NW
Part of the NW portion from Yellowhead to 137 avenue / West Regional Road opened.
Tenders due in 2008, Construction to start in 2009


Anthony Henday Stoney Plain Road Interchange
Part of the NW portion of the AHD. Construction to start at fist phase of NW AHD
Tenders due in 2008, Construction to start in 2009



23 Ave and Gateway Blvd - Under Construction





Edmonton Ports

GreyHound / VIA Rail Hub
Developer: ? Architect: O'Neill O'Neill Procinsky Architects Location: 121 Street and Yellowhead Trail at current Via Rail Station Number of floors:

Port Alberta
http://corporate.edmontonairports.co...t/port_alberta
Developer: ? Architect: ? Location: Edmonton International Airport
13,000 sq. metres of dedicated new cargo apron in 2007
3,000 acres under development plan for 2008
__________________
Short term pain for long term gain

Last edited by 240glt; Aug 14, 2008 at 9:51 PM.
Reply With Quote
     
     
  #18  
Old Posted Jun 4, 2008, 4:28 AM
240glt's Avatar
240glt 240glt is offline
HVAC guru
 
Join Date: Sep 2006
Location: YEG -> -> -> Nelson BC
Posts: 11,297
Added: Latest Edmonton Clinic Renderings. This project has just gotten underway




__________________
Short term pain for long term gain
Reply With Quote
     
     
  #19  
Old Posted Mar 18, 2008, 1:36 AM
240glt's Avatar
240glt 240glt is offline
HVAC guru
 
Join Date: Sep 2006
Location: YEG -> -> -> Nelson BC
Posts: 11,297
Partially updated front page to fix links, update status & photos, some new projects added... still a few to go yet, but now's the time to review & let me know what's missing.

Thanks in advance & thanx to Feepa once again for doing the lions' share of the work
__________________
Short term pain for long term gain
Reply With Quote
     
     
  #20  
Old Posted Mar 19, 2008, 3:10 AM
itom 987's Avatar
itom 987 itom 987 is offline
Moderator
 
Join Date: Aug 2003
Location: Edmonton
Posts: 5,047
Isn't the Arlington tower approved?
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Edmonton
Forum Jump


Thread Tools
Display Modes

Forum Jump


All times are GMT. The time now is 11:23 PM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.