Quote:
Originally Posted by Bobert
That north bound bike lane is eventually gonna have to go to make a collector for NB Bridge -> EB Columbia
|
I take back what I said before, I hadn't looked at the map closely enough or what not..
It could be a six lane and eliminate some of the scourge of merging and still have the same configuration for McBribe Blvd as it does now: two lanes north and two south.
Oh well, opportunity lost. I think this situation sounds a lot like the one with the latest proposal for George Massey crossing. It too is short of lanes to eliminate merging.
I suppose the one silver lining with the tunel compared to the bridge is at least the tunnel configuration, I believe, isn't 100% cut in stone like this one now is. Unless I'm mistaken they haven't signed a contract and started, so the config could change. That being said, we constantly complain the delay of the tunnel construction start, in any configuration.