  #7141  
Old Posted Oct 8, 2020, 6:17 PM
Dengler Avenue's Avatar
Dengler Avenue Dengler Avenue is offline
Road Engineer Wannabe
 
Join Date: Sep 2017
Location: Côté Ouest de la Rivière des Outaouais
Posts: 8,676
Quote:
That has more to do with the historical railway it replaced between Vancouver and New West.
I remembered seeing the railway crossing under Royal Oak Station and I was confused.
__________________
My Proposal of TCH Twinning in Northern Ontario
Disclaimer: Most of it is pure pie in the sky, so there's no need to be up in the arm about it.
     
     
  #7142  
Old Posted Oct 8, 2020, 6:24 PM
scryer scryer is offline
Registered User
 
Join Date: Feb 2014
Posts: 1,964
Ok... me-likes.

But what about the Millennium line to UBC? Can I have both ?

P.S: I totally get that the SLS is super easy for politicians to quickly get done as opposed to the M-line to UBC since SLS is all above ground and has a lot less constructive obstacles to work through.
__________________
There is a housing crisis, and we simply need to speak up about it.

Pinterest - I use this social media platform to easily add pictures into my posts on this forum. Plus there are great architecture and city photos out there as well.
     
     
  #7143  
Old Posted Oct 8, 2020, 6:41 PM
red-paladin red-paladin is offline
Vancouver Moderator
 
Join Date: Sep 2008
Location: Burnaby
Posts: 3,626
As soon as we know whether this will be one or two phases (still not clear to me) and there is an official announcement about that, we can update the title of the thread.
     
     
  #7144  
Old Posted Oct 8, 2020, 7:17 PM
xd_1771's Avatar
xd_1771 xd_1771 is offline
(daka_x)
 
Join Date: Aug 2010
Location: Metro Vancouver, Canada
Posts: 1,740
It's a clear-cut commitment to build both phases ("the entire line"), including transferring the project ownership to the province similar to what was done with the Pattullo Bridge ("make construction of [SLS] provincial capital project") to presumably expedite both phases at once and not leave the project hanging on TransLink's ability to provide the regional share of funds

Evidently the intention is to have the line completed as all 16 kilometres within a single phase.

Horgan did mention that the federal government would need to put up their share of the funding (i.e. a 50-50 partnership) which I guess is a reasonable expectation at this point.
     
     
  #7145  
Old Posted Oct 8, 2020, 7:33 PM
idunno idunno is offline
Registered User
 
Join Date: Feb 2010
Posts: 939
Another article confirming the entire SLS extension in one phase:

https://dailyhive.com/vancouver/bc-ndp-surrey-langley-skytrain-extension-platform
     
     
  #7146  
Old Posted Oct 8, 2020, 7:40 PM
red-paladin red-paladin is offline
Vancouver Moderator
 
Join Date: Sep 2008
Location: Burnaby
Posts: 3,626
I appreciate the input. I'll change the title.
     
     
  #7147  
Old Posted Oct 8, 2020, 7:53 PM
cganuelas1995 cganuelas1995 is offline
Registered User
 
Join Date: Jan 2017
Posts: 1,649
Quote:
Originally Posted by SFUVancouver View Post
Good. Build it ASAP.
Nah screw that, let's essentially kill it before the election and turn it into an election promise.
     
     
  #7148  
Old Posted Oct 9, 2020, 12:04 AM
xd_1771's Avatar
xd_1771 xd_1771 is offline
(daka_x)
 
Join Date: Aug 2010
Location: Metro Vancouver, Canada
Posts: 1,740
My understanding is that the splitting into two phases was essentially only meant to be a solution to the limitation in funding, since only the $1.6 billion in the (previous LRT) funding could be secured after election time 2018. Planning had been done for both phases regardless (including the business case being for both phases even with a commitment only in place for phase 1/2), essentially meaning that if the full funding is there before substantial work (i.e. procurement, contracts) had been completed, then naturaly the two phases can proceed as a single phase.

This is now essentially guaranteed with the NDP taking the project into provincial jurisdiction. They will expect the federal government to put up their share, but could very well go it on their own in the extremely unlikely case that the federal government says they have no federal money available.
     
     
  #7149  
Old Posted Oct 9, 2020, 12:31 AM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,648
Quote:
Originally Posted by scryer View Post
Ok... me-likes.

But what about the Millennium line to UBC? Can I have both ?

P.S: I totally get that the SLS is super easy for politicians to quickly get done as opposed to the M-line to UBC since SLS is all above ground and has a lot less constructive obstacles to work through.
Announcement next week lol
     
     
  #7150  
Old Posted Oct 9, 2020, 1:14 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,621
Great news!
     
     
  #7151  
Old Posted Oct 9, 2020, 1:20 AM
Tvisforme's Avatar
Tvisforme Tvisforme is offline
Registered User
 
Join Date: Sep 2014
Location: Metro Vancouver
Posts: 2,150
Hopefully, this will go through. My only concern is that if it is built all at once, that might delay the opening of the portion ending at Fleetwood past the estimated late 2025 target. I would prefer to see the line progress so that it can be opened in phases.
     
     
  #7152  
Old Posted Oct 9, 2020, 1:42 AM
xd_1771's Avatar
xd_1771 xd_1771 is offline
(daka_x)
 
Join Date: Aug 2010
Location: Metro Vancouver, Canada
Posts: 1,740
Quote:
Originally Posted by Tvisforme View Post
Hopefully, this will go through. My only concern is that if it is built all at once, that might delay the opening of the portion ending at Fleetwood past the estimated late 2025 target. I would prefer to see the line progress so that it can be opened in phases.
We've had phased openings of other extensions - specifically, the Millennium Line initially opening to Braid and then the rest of the way. Similarly, the Evergreen Extension could be considered 'phased' in a way with the earlier opening of Platform 3 at Lougheed TC. If say the construction gets going at the station sites all at once and then the elevated guideway truss makes its way out to 166 St, that portion I imagine could be fitted with tracks and infrastructure fast enough for an early opening before the remainder of the guideway is built.
     
     
  #7153  
Old Posted Oct 9, 2020, 1:53 AM
Metro-One's Avatar
Metro-One Metro-One is online now
Registered User
 
Join Date: Sep 2008
Location: Japan
Posts: 17,947
Good news indeed.


Quote:
Originally Posted by scryer View Post
Ok... me-likes.

But what about the Millennium line to UBC? Can I have both ?

P.S: I totally get that the SLS is super easy for politicians to quickly get done as opposed to the M-line to UBC since SLS is all above ground and has a lot less constructive obstacles to work through.
It’s more to do with the fact that the entire E-Line extension is currently having the detailed design phase done together as a single project, but the M-Line extension beyond Arbutus is nothing more than a general idea. No exact routes selected, exact station placements, etc...
__________________
Bridging the Gap
Check out my Flickr: https://www.flickr.com/photos/30634635@N03/with/29495547810/ and Youtube channel https://www.youtube.com/channel/UCV0_0h9qKlhxXFxuAey_q6Q
     
     
  #7154  
Old Posted Oct 9, 2020, 2:38 AM
Bobert Bobert is offline
Registered User
 
Join Date: Feb 2016
Posts: 249
That 184st station is going to be huge considering the new hospital going up in Cloverdale.

A lot of people were wondering how healthcare workers would access the site. From 184/Fraser to the hospital proposed location is probably a ~10min bus ride.
     
     
  #7155  
Old Posted Oct 9, 2020, 12:27 PM
scryer scryer is offline
Registered User
 
Join Date: Feb 2014
Posts: 1,964
Quote:
Originally Posted by Metro-One View Post
Good news indeed.

It’s more to do with the fact that the entire E-Line extension is currently having the detailed design phase done together as a single project, but the M-Line extension beyond Arbutus is nothing more than a general idea. No exact routes selected, exact station placements, etc...
Yeah I totally had that in mind with my last post. The Expo extension to Langley is just "low-hanging fruit" for a political party to grab since most of the admin work is already done and it is pretty easy to construct without having to face complicated construction techniques, a loud NIMBY crowd, and extensive admin work.

Don't get me wrong, I'm nothing short of thrilled to see that this project remains a regional priority even though I am a little salty that the M-Line extension to UBC isn't getting the encouragement it needs. I cheer for ALL of the lower mainland, BC, and Canada but the UBC extension is so long overdue for Metro Vancouver; the admin work and studies for it should also be a priority. And although I don't necessarily agree with NDP's policies on a federal level, they have indeed done a decent job at running the province AFAIK so it's not like I would have a lot of cognitive dissonance giving them my vote. But hey, like I said, I get that the SLS is low hanging fruit.

I'm talking myself in circles lol .
__________________
There is a housing crisis, and we simply need to speak up about it.

Pinterest - I use this social media platform to easily add pictures into my posts on this forum. Plus there are great architecture and city photos out there as well.
     
     
  #7156  
Old Posted Oct 9, 2020, 3:49 PM
WarrenC12's Avatar
WarrenC12 WarrenC12 is offline
Registered User
 
Join Date: May 2007
Location: East OV!
Posts: 24,607
So we should have two skytrain extensions under construction at the same time?
     
     
  #7157  
Old Posted Oct 9, 2020, 4:15 PM
Tvisforme's Avatar
Tvisforme Tvisforme is offline
Registered User
 
Join Date: Sep 2014
Location: Metro Vancouver
Posts: 2,150
Quote:
Originally Posted by WarrenC12 View Post
So we should have two skytrain extensions under construction at the same time?
Wasn't that the case all along? Broadway is under way and the Surrey extension to Fleetwood, while not as far along, is targeted to open in late 2025 as well IIRC.
     
     
  #7158  
Old Posted Oct 9, 2020, 4:23 PM
WarrenC12's Avatar
WarrenC12 WarrenC12 is offline
Registered User
 
Join Date: May 2007
Location: East OV!
Posts: 24,607
Quote:
Originally Posted by Tvisforme View Post
Wasn't that the case all along? Broadway is under way and the Surrey extension to Fleetwood, while not as far along, is targeted to open in late 2025 as well IIRC.
I didn't really think anything was firmed up for Fleetwood.
     
     
  #7159  
Old Posted Oct 9, 2020, 4:25 PM
TheTerminalCity TheTerminalCity is offline
Registered User
 
Join Date: Feb 2019
Posts: 92
Quote:
Originally Posted by Tvisforme View Post
Wasn't that the case all along? Broadway is under way and the Surrey extension to Fleetwood, while not as far along, is targeted to open in late 2025 as well IIRC.
Yes, that's right - both Broadway to Arbutus and out from King George to Fleetwood (or now Langley) would be built simultaneously. 2025 could be a big year for SkyTrain openings if everything is delivered on time. I'm excited about these investments coming for transit.
     
     
  #7160  
Old Posted Oct 9, 2020, 4:26 PM
TheTerminalCity TheTerminalCity is offline
Registered User
 
Join Date: Feb 2019
Posts: 92
Quote:
Originally Posted by WarrenC12 View Post
I didn't really think anything was firmed up for Fleetwood.
Fleetwood was not as advanced as the Broadway subway in the process. But the construction time was much shorter, anticipated 2022 start to construction and to open in 2025.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump


Thread Tools
Display Modes

Forum Jump


All times are GMT. The time now is 2:20 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.