Quote:
Originally Posted by Metro-One
Good news indeed.
It’s more to do with the fact that the entire E-Line extension is currently having the detailed design phase done together as a single project, but the M-Line extension beyond Arbutus is nothing more than a general idea. No exact routes selected, exact station placements, etc...
|
Yeah I totally had that in mind with my last post. The Expo extension to Langley is just "low-hanging fruit" for a political party to grab since most of the admin work is already done and it is pretty easy to construct without having to face complicated construction techniques, a loud NIMBY crowd, and extensive admin work.
Don't get me wrong, I'm nothing short of thrilled to see that this project remains a regional priority even though I am a little salty that the M-Line extension to UBC isn't getting the encouragement it needs. I cheer for ALL of the lower mainland, BC, and Canada but the UBC extension is so long overdue for Metro Vancouver; the admin work and studies for it should also be a priority. And although I don't necessarily agree with NDP's policies on a federal level, they have indeed done a decent job at running the province AFAIK so it's not like I would have a lot of cognitive dissonance giving them my vote. But hey, like I said, I get that the SLS is low hanging fruit.
I'm talking myself in circles lol

.