HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Atlantic Provinces


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted May 7, 2019, 11:57 AM
MonctonRad's Avatar
MonctonRad MonctonRad is online now
Wildcats Rule!!
 
Join Date: Jun 2008
Location: Moncton NB
Posts: 41,370
The final roadblock to this new apartment project on Pleasant Street has been cleared:

Brutalist-style Moncton church rezoned to make way for new apartment building
Archbishop Valéry Vienneau said diocese needs money and would demolish the building regardless
Tori Weldon · CBC News · Posted: May 07, 2019 8:04 AM AT | Last Updated: 44 minutes ago
https://www.cbc.ca/news/canada/new-bruns...olition-sexual-abuse-brutalism-1.5125606

Some notes:

Quote:
Albert Boudreau of Moncton-based ATMJ Properties Inc., said he made changes to the design of the apartment building to change the roof. He also said he decided to incorporate the bell tower into his development, "in honour of the architects involved in the original design both the bell tower and the church."
Quote:
The developer now plans to start construction by mid-summer and have the project done within a year.

The bell tower will be saved.

Last edited by MonctonRad; May 7, 2019 at 12:15 PM.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Atlantic Provinces
Forum Jump


Thread Tools
Display Modes

Forum Jump


All times are GMT. The time now is 8:01 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.