HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted Feb 21, 2018, 3:39 PM
Kitchissippi's Avatar
Kitchissippi Kitchissippi is offline
Busy Beaver
 
Join Date: Nov 2005
Location: Ottawa
Posts: 4,677
Quote:
Originally Posted by acottawa View Post
I don't think I would assume retrofitting old infrastructure is cheaper than building new infrastructure, particularly when changing the purpose.
The most difficult thing about this type of bridge is the piers, especially with regards to environmental assessment because of their impact on the river. In the case of the PoW bridge, they already exist.

I think the comparable here was the widening of the Champlain Bridge which is similar in length if not longer. In the late 1990s the NCC replaced the steel girders with concrete spans and a deck twice as wide as the old one, using the same piers with some modifications. The cost was around $30 million then. I could see the same thing being done to the PoW, doing a 2-lane bus bridge + peds/bikes, which would be made suitable for LRT in the future but not necessarily heavy rail.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump


Thread Tools
Display Modes

Forum Jump


All times are GMT. The time now is 9:10 PM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.