View Poll Results: Based on options for Broadway Corridor Study, what is your preferred choice?
BRT: Commercial to UBC 25 6.16%
LRT A: Commercial to UBC OR Commercial via VCC to UBC 31 7.64%
LRT B: Main St. to UBC AND Commercial to UBC 18 4.43%
RRT: Commercial to UBC OR VCC to UBC 283 69.70%
COMBO: RRT to Arbutus/LRT to Main St via Arbutus 39 9.61%
BUS: Enhanced Bus Service for all buses to UBC 10 2.46%
Voters: 406. You may not vote on this poll

Closed Thread

 
Thread Tools Display Modes
     
     
  #7721  
Old Posted Mar 22, 2017, 11:29 PM
Jebby's Avatar
Jebby Jebby is offline
........
 
Join Date: Dec 2010
Location: Mexico City
Posts: 3,330
Quote:
Originally Posted by officedweller View Post
I think it would be a raw, unfinished concrete ledge without lighting, PA, safety systems, etc. until time to expand.
It's not like it would be expensive to finish the entire platform. 80m finished platform vs 100m finished platform probably amounts to less than 0.5% of the total line's budget.
__________________
In the heart of a busy metropolis skyscrapers are a vivid reminder of the constant yearning of the human spirit to rise to God
     
     
  #7722  
Old Posted Mar 23, 2017, 1:24 AM
mezzanine's Avatar
mezzanine mezzanine is offline
Registered User
 
Join Date: Aug 2002
Posts: 2,011
I'm guessing bc of the ongoing expense to service the extra extension (eg, lighting, trash, cleaning), which is entirely on translink, not Ottawa/Victoria.

japan may leave unused sections unlit and 'roped off', not walled off, but expectations may be different (eg, unlit sections in Canada being deemed 'unsafe' by passengers, being a magnet for litter, etc)
     
     
  #7723  
Old Posted Mar 23, 2017, 1:28 AM
Reecemartin's Avatar
Reecemartin Reecemartin is offline
YouTube Creator
 
Join Date: Sep 2015
Location: Vancouver/Toronto
Posts: 1,776
[Deleted]

Last edited by Reecemartin; Nov 18, 2020 at 1:30 AM.
     
     
  #7724  
Old Posted Mar 23, 2017, 4:38 AM
Hooknose Hooknose is offline
Registered User
 
Join Date: Mar 2017
Posts: 248
Quote:
Originally Posted by jsbertram View Post
I can't say anything that isn't already public.

I can say that the new stations will have (at minimum) 80 M platforms, because that is what is needed to hold a Mk I 6 car train, and this is an extension of the Millennium Line. With the high cost of using cut & cover to dig up the streets to renovate and extend the underground stations in order to extend the platforms 20 M, it would in the long run be cheaper to build the 100 M platforms as part of the initial construction and cover up the extra 20M until longer trains are needed - just like Canada Line has done. Of course, the rest of the older stations will also need their platforms extended to 100 M before the longer trains can be running.
Well, the great news is that the new stations are 80 meters - at least. What a relief to know that the wonderful people who made sure that the Canada Line would never be able to handle more traffic than they encountered on opening day got sidelined.

If it costs just 1/2 of one percent to make them 100 instead of 80, Then it could have cost only 1 or 1.5% more for the Canada line to have the same 80 or 100 meter platforms.

Thanks for the news, it is great news and show us that someone , somewhere in Translink has learned at least something.
     
     
  #7725  
Old Posted Mar 23, 2017, 4:44 AM
Hooknose Hooknose is offline
Registered User
 
Join Date: Mar 2017
Posts: 248
Metcalf's law on the Millennium Line

What people don't get about the Millennium line is that it will encounter network effects, along the lines of Metcalf's law. With the line to Arbutus built, the ML will have three regional centres, a gazzilion new condos, two large areas for tech (Mount Pleasant and Lake City), connections to the airport, the provinces main medical centres, and one university (SFU). When it finally goes ot UBC, you add a second university and the 550 start ups that are clustered there now.

Metcalf's law says that when you add anything to one part of the line, the value of the whole line goes up. In other words, adding UBC and its start ups increases the value of the line al the way along as well as all real estate within the proverbial 500 meters of a station.

Everytime a new building is added anywhere along the ML, the value of the whole network goes up as the possibilities for new combinations (where to live , where to work, etc) goes up.

The 80 meter stations are great news (provision to go to one hundred is even better news).

My prediction : Fully built, people will start to live on the Line because they simply will not need to go anywhere else You won't need a car. You will buy one annual transit pass and travel back and forth, as and when you please, totally free of traffic and hassles.

The ML will be an artery that will cut right across the city and, perhaps in time, be more important than lines that go downtown.

Thanks again for the info
     
     
  #7726  
Old Posted Mar 23, 2017, 4:25 PM
aberdeen5698's Avatar
aberdeen5698 aberdeen5698 is offline
Registered User
 
Join Date: May 2010
Posts: 4,786
Quote:
Originally Posted by Hooknose View Post
If it costs just 1/2 of one percent to make them 100 instead of 80, Then it could have cost only 1 or 1.5% more for the Canada line to have the same 80 or 100 meter platforms.
I think the 0.5% figure was based on the cost to finish the extra 20m of platform, not to build it. Making the station 25% longer is going to add something close to 25% of the station cost, especially with a cut-and-cover construction method where much of the cost is in the excavation. And while I'm no transit construction expert, I've gotta believe that the cost of the stations is a pretty significant portion of the overall budget.
     
     
  #7727  
Old Posted Mar 23, 2017, 5:12 PM
Jebby's Avatar
Jebby Jebby is offline
........
 
Join Date: Dec 2010
Location: Mexico City
Posts: 3,330
Quote:
Originally Posted by aberdeen5698 View Post
I think the 0.5% figure was based on the cost to finish the extra 20m of platform, not to build it. Making the station 25% longer is going to add something close to 25% of the station cost, especially with a cut-and-cover construction method where much of the cost is in the excavation. And while I'm no transit construction expert, I've gotta believe that the cost of the stations is a pretty significant portion of the overall budget.
Yeah, I was talking about finishing the platform. The difference between building an entire station at 80m and 100m is likely around 10% or more.

The cost of finishing a platform (floors, tiles, lighting, etc) is likely less than 0.5% of the total budget for a station considering you already excavated, poured concrete, have cabling, etc done already.
__________________
In the heart of a busy metropolis skyscrapers are a vivid reminder of the constant yearning of the human spirit to rise to God
     
     
  #7728  
Old Posted Mar 23, 2017, 10:28 PM
Hooknose Hooknose is offline
Registered User
 
Join Date: Mar 2017
Posts: 248
Quote:
Originally Posted by Jebby View Post
Yeah, I was talking about finishing the platform. The difference between building an entire station at 80m and 100m is likely around 10% or more.

The cost of finishing a platform (floors, tiles, lighting, etc) is likely less than 0.5% of the total budget for a station considering you already excavated, poured concrete, have cabling, etc done already.
The numbers just posted make sense. Thanks for posting them.
The issue is really that for a few percent more, you can prepare the line for double the capacity.
Plan for 100 meters, build just 40 meters if you have to fool yourself that this is a real saving but provide for expansion at 1/2 of 1% for each additional 20 meters when the reality of just how popular this line will be, finally sinks in at "headquarters".
     
     
  #7729  
Old Posted Mar 23, 2017, 10:45 PM
Bcasey25raptor's Avatar
Bcasey25raptor Bcasey25raptor is offline
Registered User
 
Join Date: Sep 2011
Location: Vancouver Suburbs
Posts: 2,880
Quote:
Originally Posted by retro_orange View Post
Good luck with that.

Nah I think it's pretty likely the BC LINO Government will fund these projects especially with Ottawa putting the money on the table.

It's very bad optics not to.
__________________
River District Big Government progressive
~ Just Watch me
- Pierre Elliot Trudeau
     
     
  #7730  
Old Posted Mar 24, 2017, 12:35 AM
Jebby's Avatar
Jebby Jebby is offline
........
 
Join Date: Dec 2010
Location: Mexico City
Posts: 3,330
Quote:
Originally Posted by Hooknose View Post
The numbers just posted make sense. Thanks for posting them.
The issue is really that for a few percent more, you can prepare the line for double the capacity.
Plan for 100 meters, build just 40 meters if you have to fool yourself that this is a real saving but provide for expansion at 1/2 of 1% for each additional 20 meters when the reality of just how popular this line will be, finally sinks in at "headquarters".
40m can't be built for the M-Line extension since SkyTrain already has 80m trains running.
__________________
In the heart of a busy metropolis skyscrapers are a vivid reminder of the constant yearning of the human spirit to rise to God
     
     
  #7731  
Old Posted Mar 24, 2017, 1:50 AM
VancouverOfTheFuture's Avatar
VancouverOfTheFuture VancouverOfTheFuture is offline
Registered User
 
Join Date: Apr 2014
Posts: 3,481
Quote:
Originally Posted by Hooknose View Post
The numbers just posted make sense. Thanks for posting them.
The issue is really that for a few percent more, you can prepare the line for double the capacity.
Plan for 100 meters, build just 40 meters if you have to fool yourself that this is a real saving but provide for expansion at 1/2 of 1% for each additional 20 meters when the reality of just how popular this line will be, finally sinks in at "headquarters".
Quote:
Originally Posted by Jebby View Post
40m can't be built for the M-Line extension since SkyTrain already has 80m trains running.
this^^^

only the Canada-Line can have less-than 80m platforms while not hindering capacity AS MUCH as it would on the E & M lines. Canada-Line trains are wider which is why trains can be shorter.

all platforms on the E & M-Line should probably be built to 120m realistically so that the stations never need to be renovated for ~1/2 a century.
     
     
  #7732  
Old Posted Mar 24, 2017, 3:29 AM
GilmoreStation GilmoreStation is offline
BANNED
 
Join Date: Apr 2016
Location: Burnaby
Posts: 465
Now that the CRA is going to phase out tax credit from monthly transit passes, they will use the extra tax revenue to build the Millenium Line extension
     
     
  #7733  
Old Posted Mar 24, 2017, 4:22 AM
WarrenC12's Avatar
WarrenC12 WarrenC12 is offline
Registered User
 
Join Date: May 2007
Location: East OV!
Posts: 24,608
Quote:
Originally Posted by GilmoreStation View Post
Now that the CRA is going to phase out tax credit from monthly transit passes, they will use the extra tax revenue to build the Millenium Line extension
The $200M/year that the tax break cost the government? Across the country? Sure...
     
     
  #7734  
Old Posted Mar 24, 2017, 5:45 AM
jbrizzy jbrizzy is offline
Registered User
 
Join Date: May 2011
Location: Vancouver
Posts: 129
Keep in mind, once the renovation of Metrotown station is done it will be impossible to extend the platform in either direction to make it longer than 80 metres... I don't think there'll be any interest in tearing it all down in the next 30-40 years at least.. There's still room to add 5th cars when capacity needs to be increased.
     
     
  #7735  
Old Posted Mar 24, 2017, 1:07 PM
Reecemartin's Avatar
Reecemartin Reecemartin is offline
YouTube Creator
 
Join Date: Sep 2015
Location: Vancouver/Toronto
Posts: 1,776
[Deleted]

Last edited by Reecemartin; Nov 18, 2020 at 1:30 AM.
     
     
  #7736  
Old Posted Mar 24, 2017, 3:16 PM
WarrenC12's Avatar
WarrenC12 WarrenC12 is offline
Registered User
 
Join Date: May 2007
Location: East OV!
Posts: 24,608
80m trains at <90s headway is "plenty". Once that hits capacity, other lines should be created or upgraded to offset load, as mentioned by others here.
     
     
  #7737  
Old Posted Mar 24, 2017, 3:45 PM
Jebby's Avatar
Jebby Jebby is offline
........
 
Join Date: Dec 2010
Location: Mexico City
Posts: 3,330
Quote:
Originally Posted by WarrenC12 View Post
80m trains at <90s headway is "plenty". Once that hits capacity, other lines should be created or upgraded to offset load, as mentioned by others here.
Once you reach the 25,000pphpd capacity with trains and frequency it makes more sense to build a parallel line since you'd probably have to substantially upgrade every station to handle additional loads.
__________________
In the heart of a busy metropolis skyscrapers are a vivid reminder of the constant yearning of the human spirit to rise to God
     
     
  #7738  
Old Posted Mar 24, 2017, 5:49 PM
Aroundtheworld Aroundtheworld is offline
Registered User
 
Join Date: Oct 2013
Posts: 623
Quote:
Originally Posted by Jebby View Post
Once you reach the 25,000pphpd capacity with trains and frequency it makes more sense to build a parallel line since you'd probably have to substantially upgrade every station to handle additional loads.
I agree with this. By then, there will be enough demand for rapid transit on the 41st avenue corridor, which will relieve both the Millennium Line and Expo Line (partially).
     
     
  #7739  
Old Posted Mar 24, 2017, 6:26 PM
Jebby's Avatar
Jebby Jebby is offline
........
 
Join Date: Dec 2010
Location: Mexico City
Posts: 3,330
Quote:
Originally Posted by Aroundtheworld View Post
I agree with this. By then, there will be enough demand for rapid transit on the 41st avenue corridor, which will relieve both the Millennium Line and Expo Line (partially).
Or a Hastings Line relieve Downtown demand from the Expo and Canada Lines. The line can the turn north-south to connect with Brentwood and Metrotown as well.
__________________
In the heart of a busy metropolis skyscrapers are a vivid reminder of the constant yearning of the human spirit to rise to God
     
     
  #7740  
Old Posted Mar 24, 2017, 7:25 PM
twoNeurons twoNeurons is offline
loafing in lotusland
 
Join Date: Aug 2002
Location: Lotusland
Posts: 6,114
Quote:
Originally Posted by jbrizzy View Post
Keep in mind, once the renovation of Metrotown station is done it will be impossible to extend the platform in either direction to make it longer than 80 metres... I don't think there'll be any interest in tearing it all down in the next 30-40 years at least.. There's still room to add 5th cars when capacity needs to be increased.
I thought the Metrotown station renovations were essentially enabling a 100m platform for that station? Are you sure about that?
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump


Thread Tools
Display Modes

Forum Jump


All times are GMT. The time now is 9:23 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.