Quote:
Originally Posted by swimmer_spe
There is well over 1900km of 2 lane TCH in Ontario still left to twin. Almost 3000km if you also count both Highway 11 and 17.
Most of it is through granite.
|
What are volumes like through there?
BC #1 from the Alberta border to west of Revelstoke has pretty low traffic volumes. Only 3 to 4,000 vehicles daily during Jan/Feb to approx. 12 to 15,000 daily during the peak summer months. The absolute peak would be ~18k a day before and after the August long weekend. The current highway has a capacity for ~20-24,000 vehicles a day (based on other studies done on two/three-lane highways by the MoTI in BC), but could use some more passing lanes.
The only way to get it twinned within the next 30 years would be to TOLL it, which I would totally support! Maybe $30 each way for cars and $40 for RVs. User pay is a win/win! They could just set up TOLL booths before Golden.