HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Calgary > Transportation & Infrastructure


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #10  
Old Posted Aug 11, 2015, 3:53 PM
Full Mountain's Avatar
Full Mountain Full Mountain is offline
YIMBY
 
Join Date: Aug 2008
Posts: 2,938
Quote:
Originally Posted by sim View Post
Not sure who these individuals might be, but it would seem weird that they already know the conclusive results of studies that haven't happened yet...
I'm sure there are plenty of geotechnical reports from the emergency ops center, SAIT, Centre Street bridge work, and other work along that hill over the years that can be used for reference. The beauty of geotechnical reports is that they don't change over time.

That said, I'm sure there will be detailed project specific reports done over then next year or so. I would expect a core to be taken every 300-500m for the entire length over that time frame. The challenge will be getting cores from the river bed and the hill.
__________________
Incremental Photo - @PhotogX_1

Disclaimer: All opinions expressed are my own not those of any affiliated organizations.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Calgary > Transportation & Infrastructure
Forum Jump


Thread Tools
Display Modes

Forum Jump


All times are GMT. The time now is 6:46 AM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.