Quote:
Originally Posted by Policy Wonk
And here we are again at the point where we are talking past one another by decades. I don't see a lot of point pressing on with this. You are talking about a Calgary in the fairly near future. I am talking about a much larger city mid-century.
I have never argued otherwise, I have always said I believe both lines will be grade separated long before any variation on the NCLRT is built.
And this will be funded how? How is it that begging for money from Edmonton is going to become so much more lucrative than it has been up to this point. Especially in your time frame where I'm guessing Calgary and Edmonton are not going to enjoy the most constructive relationship with the Wild Rose government.
|
I don't know why you think we are talking in different time periods. Sure, the phasing and short term timelines might be off, but our dispute is about building a transit system for Calgary mid century. I think a centre street alignment for such a scenario is better than a nose creek alignment.
Here is my thought on timing, in order of how things are built, in case you think that I believe the centre street subway/LRT will be built in the next 5 years.
1. Bus only lanes built on Centre Street (median running), as well as along the majority of the SE right of way (current operation on 9th avenue in Inglewood may change to lane reversals and better enforced bus only lanes). Likely built in the next 5 years.
2. Centre portion of "Green Line" LRT is built. Quarry Park to 64th avenue or maybe to North Pointe. Likely 20 years from now.
3. Stephan Avenue Subway built. Likely 25 years from now.
4. Green line extended to Keystone Hills and South Hospital. 30 years from now.
I love how all your arguments somehow place the centre street alignment as this ridiculously expensive proposal, but burying both the 8th avenue and 7th avenue lines somehow isn't.