Old Posted Jan 10, 2014, 10:24 PM
mousquet's Avatar
mousquet mousquet is offline
Moderator
 
Join Date: Jan 2011
Location: Greater Paris, France
Posts: 5,100
We plan to begin the demolition during the first half of 2014. The demolition will take between 6 months and 1 year, then the foundation will be dug. It will take about 1 year because it’s depth is 70 meters.

Says the always optimistic Hermitage CEO on his blog. 2015, or 2016 at worst, I assume.
Notice the 230 ft depth of the foundation, probably due to the river and a wet soil.
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Discussion Forums > Buildings & Architecture > Never Built & Visionary Projects > Cancelled Project Threads Archive
Forum Jump


Thread Tools
Display Modes

Forum Jump


All times are GMT. The time now is 3:34 AM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.