Quote:
Originally Posted by Steely Dan
^ speaking of which, when was the last time a large office/residential mixed-use tower was built in this town? was it 900 N. michigan back in '89? i wonder what happened to kill that project model.
|
My guess is:
1) you need a very large site for these projects to be viable, since you will lose alot of space dealing with the various elevator banks, lobbies, etc. Water Tower, 900N, etc each take up an entire city block.
2) depending on the market it might be making your project much riskier; however if all markets are hot (office, retail, and condo), then it seems alot more doable. I'd say if such a project were already underway it would be viable, but with all the developments in the pipeline it may currently be a little risky
3) again, depending on the market, it might be needlessly diminishing your ROI; i.e. you could make more buck if you simply stuck to a single use for the building because the profit margins for that use in that location are consistently higher than other uses.