Quote:
Originally Posted by Paniolo Man
People vastly underestimate the capacity of A&B, SLC is going to be a very large airport when B is built out.
You lot can speculate all you want, the master plan has numbers. The numbers say even with exceptional growth C won't be needed until after 2052.
|
Old airport had 82 gates (56 with jet bridges). Current airport will have 94 gates (all jet bridges)
The all jet bridge thing is much bigger, but not THAT many more total gates....