HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan


Closed Thread

 
Thread Tools Display Modes
     
     
  #11101  
Old Posted Mar 2, 2024, 3:36 AM
borkborkbork's Avatar
borkborkbork borkborkbork is offline
Registered User
 
Join Date: Jul 2014
Posts: 1,712
Quote:
Originally Posted by Riverman View Post
Remember, the members of the Mclub run the city. They are not to be told what to do.
do the friends of upper fort garry still "run" the park? because that dumb LED storytelling art/signage thing has been broken for months
     
     
  #11102  
Old Posted Mar 2, 2024, 3:41 AM
WinCitySparky's Avatar
WinCitySparky WinCitySparky is offline
Registered User
 
Join Date: Jan 2019
Posts: 2,386
I believe Richardson owns the commercial spaces directly under their building/courtyard. I did work there 14 years ago and we were working down there and on multiple floors at the same time doing various renovations and I believe I recall Richardson being the customer for all of it.
     
     
  #11103  
Old Posted Mar 2, 2024, 2:50 PM
cllew cllew is offline
Registered User
 
Join Date: Feb 2012
Posts: 4,809
Quote:
Originally Posted by WinCitySparky View Post
I believe Richardson owns the commercial spaces directly under their building/courtyard. I did work there 14 years ago and we were working down there and on multiple floors at the same time doing various renovations and I believe I recall Richardson being the customer for all of it.
You are correct its all part of what is known as the Richardson Centre which also includes the parking structure and 161 Portage Ave E building, and is managed by BentallGreenOak
     
     
  #11104  
Old Posted Mar 3, 2024, 2:25 AM
WinCitySparky's Avatar
WinCitySparky WinCitySparky is offline
Registered User
 
Join Date: Jan 2019
Posts: 2,386
Yes Bentall thank you
     
     
  #11105  
Old Posted Mar 3, 2024, 4:45 AM
trueviking's Avatar
trueviking trueviking is offline
surely you agree with me
 
Join Date: Sep 2004
Location: winnipeg
Posts: 15,002
Quote:
Originally Posted by borkborkbork View Post
i wonder what artis, richardson and harvard think of this. i would imagine that they would benefit overall but also have a harder time leasing their basement level retail spaces since they're no longer connected to anything

(or is all the retail under P&M in city-owned property?)
I think Richardson, Harvard and whoever owns the MTS building will be upset by the idea of disconnecting them from the skywalk system. That is a significant hit to their leaseability. Being on the skywalk was the entire reason Wawanesa moved from Broadway. It's not about the few shops under their buildings, but more about the indoor connectivity for their office workers to the rest of downtown.

They will have to find a solution to this before they close it, I think.
     
     
  #11106  
Old Posted Mar 4, 2024, 4:13 PM
borkborkbork's Avatar
borkborkbork borkborkbork is offline
Registered User
 
Join Date: Jul 2014
Posts: 1,712
Quote:
Originally Posted by trueviking View Post
I think Richardson, Harvard and whoever owns the MTS building will be upset by the idea of disconnecting them from the skywalk system. That is a significant hit to their leaseability. Being on the skywalk was the entire reason Wawanesa moved from Broadway. It's not about the few shops under their buildings, but more about the indoor connectivity for their office workers to the rest of downtown.

They will have to find a solution to this before they close it, I think.
They balked at $70M and years of construction. What's the cheapest option for opening P&M and preserving a skywalk connection? I presume all the options they were showing last year would be ruled on on cost?

     
     
  #11107  
Old Posted Mar 4, 2024, 4:39 PM
1ajs's Avatar
1ajs 1ajs is offline
ʇɥƃıuʞ -*ʞpʇ*-
 
Join Date: Jul 2005
Location: lynn lake
Posts: 26,519
hows it cost 79million to fix this

we should open it but have both options

by shutting it down ur making p&m less convient in the winter when working there and will push people away from wanting to be there we need the balance not one or the oitgher
     
     
  #11108  
Old Posted Mar 4, 2024, 5:17 PM
peg's Avatar
peg peg is online now
keep the good times going
 
Join Date: Jun 2017
Location: Downtown Winnipeg
Posts: 618
I wonder if they will mothball the concourse until they plan/build the transit station at P&M.

Maybe as a part of the station, they can revamp the concourse, and get some transit funding from the feds for it too.
     
     
  #11109  
Old Posted Mar 4, 2024, 5:35 PM
pspeid's Avatar
pspeid pspeid is online now
Registered User
 
Join Date: Aug 2018
Posts: 2,611
It's funny. Just a few years ago the estimated cost of opening P & M was pegged at about $15 million and some people were horrified at the cost, and predicted "carmageddon" traffic problems. I think that was before they started looking at the cost of repairing the moisture barrier for the underground walkway, but what a difference 5+ years makes. Now it's too expensive to keep it closed and repairing the concourse would create "carmageddon" traffic problems.
__________________
"Opinion is really the lowest form of intelligence"-Bill Bullard

"Naysayers are always predicting the present"-Anon.

"Rudeness is the weak man's imitation of strength"-Eric Hoffer
     
     
  #11110  
Old Posted Mar 4, 2024, 5:42 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,272
I wonder how much of that $73 million is contingency?

They can't just close the underground and let it sit. Would create a safety risk with the leaky structure below a major intersection. They'll need to do something with it at some point.

Fill it with grout? haha

Dig it out, fix the membrane. Put a snazy new ground level streetscape with transit being the main focus point.
     
     
  #11111  
Old Posted Mar 4, 2024, 5:53 PM
borkborkbork's Avatar
borkborkbork borkborkbork is offline
Registered User
 
Join Date: Jul 2014
Posts: 1,712
Quote:
Originally Posted by bomberjet View Post
leaky structure below a major intersection. They'll need to do something with it at some point
indoor water park, problem solved
     
     
  #11112  
Old Posted Mar 4, 2024, 6:22 PM
WinCitySparky's Avatar
WinCitySparky WinCitySparky is offline
Registered User
 
Join Date: Jan 2019
Posts: 2,386
I’m with bork
     
     
  #11113  
Old Posted Mar 4, 2024, 6:35 PM
Rutlander Rutlander is offline
Registered User
 
Join Date: Jan 2022
Location: Manitoba
Posts: 205
Quote:
Originally Posted by borkborkbork View Post
indoor water park, problem solved
Maybe when it opens, Sam Katz can do the ribbon cutting.
     
     
  #11114  
Old Posted Mar 4, 2024, 6:52 PM
Biff's Avatar
Biff Biff is online now
What could go wrong?
 
Join Date: Jun 2004
Location: Winnipeg
Posts: 9,887
Quote:
Originally Posted by pspeid View Post
It's funny. Just a few years ago the estimated cost of opening P & M was pegged at about $15 million and some people were horrified at the cost, and predicted "carmageddon" traffic problems..
Even back when it was announced (2018) I was told it would likely be $50m+
__________________
"But a city can be smothered by too much reverence for its past. The skyline must keep acquiring new peaks, because the day we consider it complete and untouchable is the day the city begins to die." - Justin Davidson - May 2010 Issue of New York
     
     
  #11115  
Old Posted Mar 4, 2024, 7:31 PM
drew's Avatar
drew drew is online now
the first stamp is free
 
Join Date: Feb 2004
Location: Hippyville, Winnipeg
Posts: 8,880
Classic Winnipeg. Just opening an existing intersection to pedestrians is 10s of millions of dollars. Good grief.

Let's just K.I.S.S. this issue and move on please.
     
     
  #11116  
Old Posted Mar 4, 2024, 7:34 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,272
Quote:
Originally Posted by drew View Post
Classic Winnipeg. Just opening an existing intersection to pedestrians is 10s of millions of dollars. Good grief.

Let's just K.I.S.S. this issue and move on please.
It really is ridiculous.

We're talkin about crossin the street man (in my best Allen Iverson impression).
     
     
  #11117  
Old Posted Mar 4, 2024, 7:49 PM
optimusREIM's Avatar
optimusREIM optimusREIM is offline
There is always a way
 
Join Date: May 2014
Location: Winnipeg
Posts: 3,261
I would be interested in knowing why the cost is so high? Like where does $50m go to if that is what it costs to open the interesection. I can't imagine even if you go with a high value, that it would cost that much to remove barriers, paint lines, and rejig the traffic signals and timing. Maybe I'm being naive, but perhaps we have a K.I.S.S. problem. If it costs $50m that better be the most incredible intersection with a permanent staff of 20 who keep the place clean, maintained, and man a complaint hotline 24/7
__________________
"Enlightened statesmen will not always be at the helm."
Federalist #10, James Madison
     
     
  #11118  
Old Posted Mar 4, 2024, 8:24 PM
Biff's Avatar
Biff Biff is online now
What could go wrong?
 
Join Date: Jun 2004
Location: Winnipeg
Posts: 9,887
I need to edit my response. That $50m estimate (2018) was to repair the membrane to keep the underground open. I read pspeid's post wrong.
__________________
"But a city can be smothered by too much reverence for its past. The skyline must keep acquiring new peaks, because the day we consider it complete and untouchable is the day the city begins to die." - Justin Davidson - May 2010 Issue of New York
     
     
  #11119  
Old Posted Mar 4, 2024, 8:25 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,272
The $50m+ (now $73mil) number was to repair the concourse and open the intersection.

Purely opening the intersection at the surface will require road works, streetscaping, etc and will be probably half that full re-build number in the end.
     
     
  #11120  
Old Posted Mar 4, 2024, 8:58 PM
FactaNV FactaNV is online now
Registered User
 
Join Date: Sep 2023
Posts: 2,333
Quote:
Originally Posted by bomberjet View Post
The $50m+ (now $73mil) number was to repair the concourse and open the intersection.

Purely opening the intersection at the surface will require road works, streetscaping, etc and will be probably half that full re-build number in the end.
I could see them building the future transit station during the same timeframe, if you have it opened up, may as well get it all done at once.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan
Forum Jump


Thread Tools
Display Modes

Forum Jump


All times are GMT. The time now is 4:41 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.