HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #28  
Old Posted Jun 24, 2023, 7:49 PM
Jimbo604 Jimbo604 is offline
Registered User
 
Join Date: Jan 2012
Posts: 1,847
Quote:
Originally Posted by Tvisforme View Post
Also from the North Shore News:

Quote:
TransLink to fix big gap in North Vancouver transit route Brent Richter Jun 14, 2023 2:22 PM
The North Shore’s R2 RapidBus is about to get a bit more elbow room through one of the most congested corridors of its route.

The City of North Vancouver and TransLink are set to begin a six-month construction project to extend the eastbound transit lane along Third Street and Cotton Road to Gladstone Avenue. Currently, the transit lane ends about two-thirds of the way down the hill from Queensbury Avenue, requiring the R2 to merge with general traffic for about 650 metres before getting back to a bus lane....



(Image from the North Shore News)
Through traffic on Highway 1 over bridge going faster now but with no new lanes on the bridge that capacity had to come from somewhere.

Main street onramp now seems to be slower than before Highway One Improvements: North Vancouver / Ironworkers Memorial Approach.

That change in dynamic precipitated this project Tvisforme noted moving ahead sooner than later. (imho).

When they begin if anyone is over there for pic updates we'd appreciate
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 5:11 PM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.