HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted Jun 5, 2023, 8:35 PM
ericmacm's Avatar
ericmacm ericmacm is offline
Registered User
 
Join Date: Jul 2017
Location: SW Ontario
Posts: 945
Quote:
Originally Posted by Dengler Avenue View Post
The corridor was designated until a year ago when MTO removed the freeway designation…
That said, an MTO engineer did say that the current alignment of Highway 3 would have space for expansion (probably undivided 5 lanes?). The jog around St Thomas would just feel weird.
I think they’re going to have to re-designate it, or at least come up with a new design that sends it back up to London and not send it the full way to Aylmer. I am getting the impression that this is likely going to be treated as a staged freeway, and the existing alignment of HWY 3 along Centennial and Talbot Line has far too many properties fronting it for it to work that way without a ton of expropriation. The current jog around St Thomas is awkward and crosses the railroad, so I can’t imagine they would want to keep that as the main route for what is shaping up to be a major industrial corridor.

Central Elgin is also rezoning the section south of CN Rail along HWY 3 that they still own as industrial, and I am hearing from some people that I work with who live in the area that they are also planning on rezoning more near the airport to make up for the lands lost by the annexation.
__________________
Opinions expressed here are solely my own.

Come See My Work: Pan-Canadian Skylines Project​​​ | Astrophotography Thread
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario
Forum Jump



Forum Jump


All times are GMT. The time now is 11:21 PM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.