Quote:
Originally Posted by jjavman
In the last link, the consultant's report shows several schemes for connecting to both Pitts and Howlett. Unfortunately, the news clips thus far are talking about the 2nd option of roundabouts which means a choke point for 4 lane highways.
That report also shows 2 types of flyover schemes for non stop into Pitts and Howlett. Not sure if these are conclusively ruled out.
|
I only did a quick glance through the report, but I didn’t see anything about the path of the tgh before the roundabouts. The tgh roadbed ends here:
https://maps.app.goo.gl/ugsfhXGu3cmz6Aoj9?g_st=ic at Brookfield road. Theres a distance between the there and the proposed sites of the roundabouts, so I’m curious on the path the tgh will take, given there are houses and farms in the way.