So - Is work on the new satellites officially underway? I landed from Paris yesterday and there was a ton of excavation work occurring near the end of B. Perhaps it's prep work, but my friend who works for United makes it sound like they are working on a new tram system. I take that info with a grain of salt.

Also, there appears to be work on L, where there's a small addition in the rendering posted.
Pretty sure it is just taxiway work to make room for S-1, since S-1 will block the primary taxiways going around the terminal complex.

The latest timeline that I can find says S-1 will be completed in 2027 and S-2 in 2028. Terminal 2 will be demolished in phases starting in 2026. I'd guess the E-concourse will go first to make way for taxiways coming out of the B-C alley, since the current entrance to the alley between B and T2 will be significantly impeded by S-1 construction.

Given the lack of a tunnel between S1 and the OGT until 2030 at the earliest I doubt we'll see AA use S-1 or S-2 until the OGT is complete. There won't be a way for someone to walk from T3 to S1 or S2 without going through the B-C tunnel.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Discussion Forums > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 9:30 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.