Quote:
Originally Posted by acottawa
They seem to be renovating a large section of the store near the bridge to the Rideau Centre. Not sure it is related or not.
|
Must be, I would think. I couldn't see how this would work if it's not accessible from street level. Even the second floor is a bit of a stretch, though the bridge probably brings traffic.
Saw the MEC store in the HBC downtown Toronto a couple of weeks back. Pretty underwhelming.