HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #10  
Old Posted Dec 22, 2022, 5:22 PM
sseguin sseguin is offline
 
Join Date: Aug 2018
Posts: 322
Bringing the O-Train further East: An Overview of Stage 2's Eastern Extension

O-Train Line 1 (Stage 1) opened on September 14, 2019, and featured 13 stations from Blair in the east to Tunney’s Pasture in the west. The O-Train is quickly being expanded to add additional service coverage in the East, West and South of Ottawa, in a project called Stage 2 LRT. This video will provide an overview of the Eastern Extension of O-Train Line 1, which will extend service East of Blair station to Trim Road in Orleans.

• Video Link
Reply With Quote
     
     
End
   
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 12:43 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.