Concrete pump truck onsite this morning to pour the remaining section of the ground floor slab in building 2 of the Eve Park condos. The next months will be about assembling the modular wood walls and floor panels to stand up these 4s buildings.
live webcam -
https://www.evepark.ca/comingsoon