I haven't seen what the plans are either, but I think the best place for a connection is at Jefferson Street. It would connect directly into where the new part of the Beltline on Marietta Street hits the westside connector. The terrain is elevated here to the east, making it easier to build a bridge over the railroad tracks without complicated ramps. Then it's about 1300 feet to the Proctor Creek Trail, utilizing GA Power right of way (which we know they can do because it's what was done with a big portion of the existing Proctor Creek Trail).