HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > United States > Southeast > Atlanta


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #10  
Old Posted Oct 25, 2022, 12:47 PM
shivtim's Avatar
shivtim shivtim is offline
 
Join Date: Aug 2008
Posts: 2,624
I haven't seen what the plans are either, but I think the best place for a connection is at Jefferson Street. It would connect directly into where the new part of the Beltline on Marietta Street hits the westside connector. The terrain is elevated here to the east, making it easier to build a bridge over the railroad tracks without complicated ramps. Then it's about 1300 feet to the Proctor Creek Trail, utilizing GA Power right of way (which we know they can do because it's what was done with a big portion of the existing Proctor Creek Trail).

Reply With Quote
     
     
End
   
 

Go Back   SkyscraperPage Forum > Regional Sections > United States > Southeast > Atlanta
Forum Jump



Forum Jump


All times are GMT. The time now is 5:25 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.